KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00

「ウォータジェット」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
  • 同義語オン
並び順
  • 古い順
10
( 1 10 件を表示)
  • 1
10
( 1 10 件を表示)
絞り込み
並び順
  • 古い順
  •  Leverkusen, 01.09.2018, firo, football, 1.Bundesliga, season 2018/2019, Leverkusen - VfL Wolfsburg,
    2018年09月01日
    Leverkusen, 01.09.2018, firo, football, 1.Bundesliga, season 2018/2019, Leverkusen - VfL Wolfsburg,

    firo: 01.09.2018, football, 1.Bundesliga, season 2018/2019, Bayer 04 Leverkusen - VfL Wolfsburg. 1: 3 General, depositor, BayARENA, stadium overview, pitchsprenger, water, water jet | usage worldwide、クレジット:DPA/共同通信イメージズ

    商品コード: 2018090321548

  •  Exhibition Euroblech
    2018年10月23日
    Exhibition Euroblech

    23 October 2018, Lower Saxony, Hanover: A waterjet cutting machine can be seen at the Euroblech trade fair in Hanover at the Multicam stand. Around 1500 exhibitors from 41 countries will present their products and services at Euroblech. The product range includes machines, manufacturing systems, tools and materials. Photo: Peter Steffen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018102425337

  •  Leipzig fairs Intec and Z 2019
    2019年02月05日
    Leipzig fairs Intec and Z 2019

    05 February 2019, Saxony, Leipzig: A water jet system of the company “Flow“ cuts a metal plate at a booth of the trade fair Intec. A total of more than 1300 exhibitors from 31 countries will be presenting innovations from the metal industry at two simultaneous trade fairs in Leipzig from 5 to 8 February. Among other things, Intec is dedicated to machine tool manufacturing. The focus is also on digitisation. In addition, Messe Z 2019 will focus on supply services. Photo: Sebastian Willnow/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019020702491

  •  Building inspection at Rothensee lock
    2019年03月06日
    Building inspection at Rothensee lock

    06 March 2019, Saxony-Anhalt, Magdeburg: A worker uses a high-pressure water jet to clean the dry rotating segment gate of the upper gate of the Rothensee lock. The Wasserstra゚en- und Schifffahrtsamt (WSA) has closed the lock at the Magdeburg waterway intersection. There a scheduled building inspection takes place. The revision takes place every 6 years and will last until 31 May 2019. At the same time, the barrier is used for corrosion protection and repair work on the upper and lower gates. Photo: Klaus-Dietmar Gabbert/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019030717973

  •  Building inspection at Rothensee lock
    2019年03月06日
    Building inspection at Rothensee lock

    06 March 2019, Saxony-Anhalt, Magdeburg: A worker uses a high-pressure water jet to clean the dry rotating segment gate of the upper gate of the Rothensee lock. The Wasserstra゚en- und Schifffahrtsamt (WSA) has closed the lock at the Magdeburg waterway intersection. There a scheduled building inspection takes place. The revision takes place every 6 years and will last until 31 May 2019. At the same time, the barrier is used for corrosion protection and repair work on the upper and lower gates. Photo: Klaus-Dietmar Gabbert/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019030718251

  •  Building inspection at Rothensee lock
    2019年03月06日
    Building inspection at Rothensee lock

    06 March 2019, Saxony-Anhalt, Magdeburg: A worker uses a high-pressure water jet to clean the dry rotating segment gate of the upper gate of the Rothensee lock. The Wasserstra゚en- und Schifffahrtsamt (WSA) has closed the lock at the Magdeburg waterway intersection. There a scheduled building inspection takes place. The revision takes place every 6 years and will last until 31 May 2019. At the same time, the barrier is used for corrosion protection and repair work on the upper and lower gates. Photo: Klaus-Dietmar Gabbert/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019030718217

  •  Building inspection at Rothensee lock
    2019年03月06日
    Building inspection at Rothensee lock

    06 March 2019, Saxony-Anhalt, Magdeburg: A worker uses a high-pressure water jet to clean the dry rotating segment gate of the upper gate of the Rothensee lock. The Wasserstra゚en- und Schifffahrtsamt (WSA) has closed the lock at the Magdeburg waterway intersection. There a scheduled building inspection takes place. The revision takes place every 6 years and will last until 31 May 2019. At the same time, the barrier is used for corrosion protection and repair work on the upper and lower gates. Photo: Klaus-Dietmar Gabbert/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019030717997

  •  Building inspection at Rothensee lock
    2019年03月06日
    Building inspection at Rothensee lock

    06 March 2019, Saxony-Anhalt, Magdeburg: A worker uses a high-pressure water jet to clean the dry rotating segment gate of the upper gate of the Rothensee lock. The Wasserstra゚en- und Schifffahrtsamt (WSA) has closed the lock at the Magdeburg waterway intersection. There a scheduled building inspection takes place. The revision takes place every 6 years and will last until 31 May 2019. At the same time, the barrier is used for corrosion protection and repair work on the upper and lower gates. Photo: Klaus-Dietmar Gabbert/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019030800029

  •  Building inspection at Rothensee lock
    2019年03月06日
    Building inspection at Rothensee lock

    06 March 2019, Saxony-Anhalt, Magdeburg: A worker uses a high-pressure water jet to clean the dry rotating segment gate of the upper gate of the Rothensee lock. The Wasserstra゚en- und Schifffahrtsamt (WSA) has closed the lock at the Magdeburg waterway intersection. There a scheduled building inspection takes place. The revision takes place every 6 years and will last until 31 May 2019. At the same time, the barrier is used for corrosion protection and repair work on the upper and lower gates. Photo: Klaus-Dietmar Gabbert/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019030718265

  •  Building inspection at Rothensee lock
    2019年03月06日
    Building inspection at Rothensee lock

    06 March 2019, Saxony-Anhalt, Magdeburg: A worker uses a high-pressure water jet to clean the dry rotating segment gate of the upper gate of the Rothensee lock. The Wasserstra゚en- und Schifffahrtsamt (WSA) has closed the lock at the Magdeburg waterway intersection. There a scheduled building inspection takes place. The revision takes place every 6 years and will last until 31 May 2019. At the same time, the barrier is used for corrosion protection and repair work on the upper and lower gates. Photo: Klaus-Dietmar Gabbert/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019030718127

  • 1