KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00

「スチール橋」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
  • 同義語オン
並び順
  • 古い順
15
( 1 15 件を表示)
  • 1
15
( 1 15 件を表示)
絞り込み
並び順
  • 古い順
  •  Train, locomotive, bridge
    2009年10月16日
    Train, locomotive, bridge

    Locomotive type 749 Zamracena on train going over the steel bridge, in Prague, Czech Republic, October 16, 2009. (CTK Photo/Martin Macak Gregor)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020120404101

  •  listed steel bridge in Policka, technical monument
    2020年08月05日
    listed steel bridge in Policka, technical monument

    The listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300311

  •  listed steel bridge in Policka, technical monument
    2020年08月05日
    listed steel bridge in Policka, technical monument

    The listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300306

  •  listed steel bridge in Policka, technical monument
    2020年08月05日
    listed steel bridge in Policka, technical monument

    The listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300388

  •  listed steel bridge in Policka, technical monument
    2020年08月05日
    listed steel bridge in Policka, technical monument

    The listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300467

  •  listed steel bridge in Policka, technical monument, detail
    2020年08月05日
    listed steel bridge in Policka, technical monument, detail

    A detail of the listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300546

  •  listed steel bridge in Policka, technical monument
    2020年08月05日
    listed steel bridge in Policka, technical monument

    The listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300308

  •  listed steel bridge in Policka, technical monument
    2020年08月05日
    listed steel bridge in Policka, technical monument

    The listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300323

  •  listed steel bridge in Policka, technical monument
    2020年08月05日
    listed steel bridge in Policka, technical monument

    The listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300483

  •  listed steel bridge in Policka, technical monument
    2020年08月05日
    listed steel bridge in Policka, technical monument

    The listed steel bridge in Policka, Svitavy region, Czech Republic, is seen during repair of that bridge on August 8, 2020. Reconstruction for 6.5 million crowns will last until the end of October 2020. Steel lattice bridge of riveted construction about 20 meters long and 4.3 meters wide on masonry embankment pillars was declared a technical monument in June 2019. (CTK Photo/Josev Vostarek)、クレジット:CTK/共同通信イメージズ

    商品コード: 2020081300322

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: A special crane lifts a 205-tonne steel bridge on the A10 motorway construction site near the Birkenwerder junction into the railway or suburban railway bridge between Oranienburg and Hohen-Neuendorf. The replacement construction by the consortium (ARGE) Havellandautobahn GmbH is being carried out in the course of the expansion of the A10 motorway and requires the motorway to be completely closed from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111304119

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: A special crane lifts a 205-tonne steel bridge on the A10 motorway construction site near the Birkenwerder junction into the railway or suburban railway bridge between Oranienburg and Hohen-Neuendorf. The replacement construction by the consortium (ARGE) Havellandautobahn GmbH is being carried out in the course of the expansion of the A10 motorway and requires the motorway to be completely closed from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111304264

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: A special crane lifts a 205-tonne steel bridge on the A10 motorway construction site near the Birkenwerder junction into the railway or suburban railway bridge between Oranienburg and Hohen-Neuendorf. The replacement construction by the consortium (ARGE) Havellandautobahn GmbH is being carried out in the course of the expansion of the A10 motorway and requires the motorway to be completely closed from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111304195

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: A special crane lifts a 205-tonne steel bridge on the A10 motorway construction site near the Birkenwerder junction into the railway or suburban railway bridge between Oranienburg and Hohen-Neuendorf. The replacement construction by the consortium (ARGE) Havellandautobahn GmbH is being carried out in the course of the expansion of the A10 motorway and requires the motorway to be completely closed from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111304550

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: A special crane lifts a 205-tonne steel bridge on the A10 motorway construction site near the Birkenwerder junction into the railway or suburban railway bridge between Oranienburg and Hohen-Neuendorf. The replacement construction by the consortium (ARGE) Havellandautobahn GmbH is being carried out in the course of the expansion of the A10 motorway and requires the motorway to be completely closed from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111708465

  • 1