KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00
  • 令和
  • 記者
  • カーボン
  • プロダクト・イノベーション
  • メガワット
  • 企業
  • 剛性
  • 安定性
  • 強度
  • 応用

「タービン・ブレード」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
  • 同義語オン
並び順
  • 古い順
302
( 1 100 件を表示)
  • 1
  • 2
  • 3
  • 4
302
( 1 100 件を表示)
絞り込み
並び順
  • 古い順
  •  Six trucks with wind turbine blades blocked in Pedrafita after being unable to pass through the A-6 viaduct
    1980年01月01日
    Six trucks with wind turbine blades blocked in Pedrafita after being unable to pass through the A-6 viaduct

    January 1, 1980, Pedrafita, Lugo (Galicia, Spain: The blocked trucks are back on the road, on January 26, 2024, in Pedrafita do Cebreiro, Lugo, Galicia (Spain). Six trucks loaded with wind turbine blades have been blocked in Pedrafita since January 23. The convoy, which was on its way to the port of Ferrol, is carrying material valued at 1.5 million euros. The company that manages the transport claims that an error in the permit granted by the Ministry of Transport and Sustainable Mobility has left the trucks in a legal vacuum with no possibility of moving forward...、クレジット:©Carlos Castro/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024012703899

  •  Six trucks with wind turbine blades blocked in Pedrafita after being unable to pass through the A-6 viaduct
    1980年01月01日
    Six trucks with wind turbine blades blocked in Pedrafita after being unable to pass through the A-6 viaduct

    January 1, 1980, Pedrafita, Lugo (Galicia, Spain: Several of the blocked trucks, on January 26, 2024, in Pedrafita do Cebreiro, Lugo, Galicia (Spain). Six trucks loaded with wind turbine blades have been blocked in Pedrafita since January 23. The convoy, which was on its way to the port of Ferrol, is carrying material valued at 1.5 million euros. The company that manages the transport claims that an error in the permit granted by the Ministry of Transport and Sustainable Mobility has left the trucks in a legal vacuum with no possibility of moving forward...、クレジット:©Carlos Castro/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024012703845

  •  Six trucks with wind turbine blades blocked in Pedrafita after being unable to pass through the A-6 viaduct
    1980年01月01日
    Six trucks with wind turbine blades blocked in Pedrafita after being unable to pass through the A-6 viaduct

    January 1, 1980, Pedrafita, Lugo (Galicia, Spain: Several of the blocked trucks, on January 26, 2024, in Pedrafita do Cebreiro, Lugo, Galicia (Spain). Six trucks loaded with wind turbine blades have been blocked in Pedrafita since January 23. The convoy, which was on its way to the port of Ferrol, is carrying material valued at 1.5 million euros. The company that manages the transport claims that an error in the permit granted by the Ministry of Transport and Sustainable Mobility has left the trucks in a legal vacuum with no possibility of moving forward...、クレジット:©Carlos Castro/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024012703994

  •  Six trucks with wind turbine blades blocked in Pedrafita after being unable to pass through the A-6 viaduct
    1980年01月01日
    Six trucks with wind turbine blades blocked in Pedrafita after being unable to pass through the A-6 viaduct

    January 1, 1980, Pedrafita, Lugo (Galicia, Spain: The blocked trucks are back on the road, on January 26, 2024, in Pedrafita do Cebreiro, Lugo, Galicia (Spain). Six trucks loaded with wind turbine blades have been blocked in Pedrafita since January 23. The convoy, which was on its way to the port of Ferrol, is carrying material valued at 1.5 million euros. The company that manages the transport claims that an error in the permit granted by the Ministry of Transport and Sustainable Mobility has left the trucks in a legal vacuum with no possibility of moving forward...、クレジット:©Carlos Castro/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024012704012

  • エアバスA300 JAS機でもブレード破断
    1996年11月02日
    エアバスA300 JAS機でもブレード破断

    エンジンの高圧タービンブレード破断トラブルが起きた日本エアシステムのエアバスA300(資料A32125・カラーネガ)

    商品コード: 1996110200002

  • 部品利用のキーホルダー 古いエンジン部品再生
    1996年11月08日
    部品利用のキーホルダー 古いエンジン部品再生

    「タービンブレード」という羽根型の部品を輪切りにして製作したキーホルダー

    商品コード: 1996110800049

  •  エンジン破損の状況確認
    2011年06月28日
    エンジン破損の状況確認

    タービンブレード損傷の概念図

    商品コード: 2011062800595

  •  エンジン破損の状況確認
    2011年06月28日
    エンジン破損の状況確認

    タービンブレード損傷の概念図

    商品コード: 2011062800596

  •  BLG Logistics Center for Siemens
    2018年10月02日
    BLG Logistics Center for Siemens

    02 October 2018, Brandenburg, Falkensee: 02 October 2018, Germany, Falkensee: Boxes with turbine blades are placed in front of the high shelves in the new logistics centre in Falkensee. BLG Logistics supplies the production of the Siemens gas turbine plant in Berlin-Moabit and its external locations in Berlin-Siemensstadt from the approximately 20000 square metre hall. Photo: Bernd Settnik/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018100322144

  •  LAX Airport Operations
    2019年03月29日
    LAX Airport Operations

    March 29, 2019, Los Angeles, California, USA: The engine fan blades of a Delta Air Lines Inc. Airbus SE A350-900 (Registration N504DN) on the tarmac at Los Angeles International Airport (LAX) on Friday, March 29, 2019 in Los Angeles, Calif. é 2019 Patrick T. Fallon (Credit Image: © Patrick Fallon/ZUMA Press Wire)、クレジット:©Patrick Fallon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2021110206104

  •  LAX Airport Operations
    2019年03月29日
    LAX Airport Operations

    March 29, 2019, Los Angeles, California, USA: The engine fan blades of a Delta Air Lines Inc. Airbus SE A350-900 (Registration N504DN) on the tarmac at Los Angeles International Airport (LAX) on Friday, March 29, 2019 in Los Angeles, Calif. é 2019 Patrick T. Fallon (Credit Image: © Patrick Fallon/ZUMA Press Wire)、クレジット:©Patrick Fallon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2021110300179

  •  LAX Airport Operations
    2019年03月29日
    LAX Airport Operations

    March 29, 2019, Los Angeles, California, USA: The engine of a Delta Air Lines Inc. Airbus SE A350-900 (Registration N504DN) on the tarmac at Los Angeles International Airport (LAX) on Friday, March 29, 2019 in Los Angeles, Calif. é 2019 Patrick T. Fallon (Credit Image: © Patrick Fallon/ZUMA Press Wire)、クレジット:©Patrick Fallon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2021110205920

  •  LAX Airport Operations
    2019年03月29日
    LAX Airport Operations

    March 29, 2019, Los Angeles, California, USA: The engine of a Delta Air Lines Inc. Airbus SE A350-900 (Registration N504DN) on the tarmac at Los Angeles International Airport (LAX) on Friday, March 29, 2019 in Los Angeles, Calif. é 2019 Patrick T. Fallon (Credit Image: © Patrick Fallon/ZUMA Press Wire)、クレジット:©Patrick Fallon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2021110206233

  •  減税·料金引き下げはハイエンド製造業の大きな力に
    2019年04月24日
    減税·料金引き下げはハイエンド製造業の大きな力に

    4月24日、ガスタービンブレードを生産する東方汽輪機有限公司の従業員。中国政府は2019年、大規模な減税・料金引き下げを実施している。増値税(付加価値税)減税は減税の核心で、通年全国の増値税減税額は1兆元(1元=約17円)以上に達する見込み。他の産業と比べ、工業企業が受ける恩恵は最も直接的で負担軽減も顕著だ。減税・費用引き下げは、企業が技術革新により多くの資金を投入するよう導く。(徳陽=新華社記者/陳健)=2019(平成31)年4月24日、クレジット:新華社/共同通信イメージズ

    商品コード: 2019052400539

  •  Russia Wind Farm
    2019年09月25日
    Russia Wind Farm

    25.09.2019 Turbine blades are pictured at a wind farm near the village of Kelemetov 45km, in Adygea, Russia. Vitaly Timkiv / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2019092712921

  •  Russia Wind Farm
    2019年09月25日
    Russia Wind Farm

    25.09.2019 A turbine blade is transported at a wind farm near the village of Kelemetov 45km, in Adygea, Russia. Vitaly Timkiv / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2019092713045

  •  「新華社」中国が独自開発した超高速3Dプリンター、科学技術展に登場
    00:39.27
    2019年10月16日
    「新華社」中国が独自開発した超高速3Dプリンター、科学技術展に登場

    中国北京市の中関村国家自主イノベーションモデルエリア展示センターで16日、2019中関村フォーラム「中関村国際最先端科学技術成果展」が開幕した。会場では、超高速3Dプリンターが大きな注目を集めている。この卓上型光硬化3Dプリンター「SLASH」は、最高速度が毎時1200ミリメートルで、世界でも高速な卓上型光硬化プリンターとなっている。最高精度は49マイクロメートルで、これはロケットエンジンのタービンブレードやインペラー上部にも使える精度で、中国が独自に開発し、知的財産権を持つコア技術となっている。このプリンターは、オーダーメード医療や教育訓練、娯楽・動画など幅広い分野での利用が見込める。(記者/趙旭、陳鍾昊、田晨旭)<映像内容>超高速3Dプリンターの様子、撮影日:2019(令和元)年10月16日、クレジット:新華社/共同通信イメージズ

    商品コード: 2019101804887

  • Industries Above Designated Size Increased in September Industries Above Designated Size Increased in September
    2020年10月19日
    Industries Above Designated Size Increased in September Industries Above Designated Size Increased in September

    A large number of wind turbine blades are discharged at the wharf waiting for shipment. Lianyungang City, Jiangsu Province, China, October 19, 2020.=2020(令和2)年10月19日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2020102102056

  • Industries Above Designated Size Increased in September Industries Above Designated Size Increased in September
    2020年10月19日
    Industries Above Designated Size Increased in September Industries Above Designated Size Increased in September

    A large number of wind turbine blades are discharged at the wharf waiting for shipment. Lianyungang City, Jiangsu Province, China, October 19, 2020.=2020(令和2)年10月19日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2020102102038

  • Port Economy Growth Port Economy Growth
    2020年11月16日
    Port Economy Growth Port Economy Growth

    A large number of chinese-made wind turbine blades are piled up at the port of Dongfang Company in Lianyungang, East China‘s Jiangsu Province, Nov. 16, 2020.=2020(令和2)年11月16日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2020111902047

  • Port Economy Growth Port Economy Growth
    2020年11月16日
    Port Economy Growth Port Economy Growth

    A large number of chinese-made wind turbine blades are piled up at the port of Dongfang Company in Lianyungang, East China‘s Jiangsu Province, Nov. 16, 2020.=2020(令和2)年11月16日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2020111902038

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303447

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303474

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303464

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303451

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303448

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    A view of wind turbine blades to be delivered at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303479

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    A view of wind turbine blades to be delivered at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303478

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303452

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work inside a wind turbine blade at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303466

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303467

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303470

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303475

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    Workers move a wind turbine blade at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303477

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    A view of wind turbine blades to be delivered at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303449

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    A view of wind turbine blades to be delivered at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303456

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    A view of wind turbine blades to be delivered at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303455

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303469

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303476

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work inside a wind turbine blade at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303460

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303450

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303453

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    People work on the wind turbine blades at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303461

  •  CHINA JIANGSU WINDFARM PRODUCTION
    2021年03月02日
    CHINA JIANGSU WINDFARM PRODUCTION

    A view of wind turbine blades to be delivered at a factory in Haimen in east China‘s Jiangsu province Tuesday, March 02, 2021. China added almost 72 gigawatts of wind power, 48 gigawatts of solar, and about 13 gigawatts of hydropower in 2020.、クレジット:Featurechina/共同通信イメージズ  ※中国での使用禁止。

    商品コード: 2021030303465

  • Nationwide Industrial Enterprises Above Eesignated Size Profits Nationwide Industrial Enterprises Above Eesignated Size Profits
    2021年03月27日
    Nationwide Industrial Enterprises Above Eesignated Size Profits Nationwide Industrial Enterprises Above Eesignated Size Profits

    A large number of wind turbine blades are discharged at the wharf waiting for shipment, Lianyungang City, Jiangsu Province, China, March 27, 2021. From January to February, China‘s Industrial Enterprises above Designated Size achieved a profit of 1114.01 billion yuan, a year-on-year increase of 1.79 times.=2021(令和3)年3月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021032916394

  • Nationwide Industrial Enterprises Above Eesignated Size Profits Nationwide Industrial Enterprises Above Eesignated Size Profits
    2021年03月27日
    Nationwide Industrial Enterprises Above Eesignated Size Profits Nationwide Industrial Enterprises Above Eesignated Size Profits

    A large number of wind turbine blades are discharged at the wharf waiting for shipment, Lianyungang City, Jiangsu Province, China, March 27, 2021. From January to February, China‘s Industrial Enterprises above Designated Size achieved a profit of 1114.01 billion yuan, a year-on-year increase of 1.79 times.=2021(令和3)年3月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021032916414

  • Nationwide Industrial Enterprises Above Eesignated Size Profits Nationwide Industrial Enterprises Above Eesignated Size Profits
    2021年03月27日
    Nationwide Industrial Enterprises Above Eesignated Size Profits Nationwide Industrial Enterprises Above Eesignated Size Profits

    A large number of wind turbine blades are discharged at the wharf waiting for shipment, Lianyungang City, Jiangsu Province, China, March 27, 2021. From January to February, China‘s Industrial Enterprises above Designated Size achieved a profit of 1114.01 billion yuan, a year-on-year increase of 1.79 times.=2021(令和3)年3月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021032916379

  •  China Jiangsu Lianyungang Port
    2021年05月27日
    China Jiangsu Lianyungang Port

    A large number of wind turbine blades are discharged at a port waiting for shipment in Lianyungang, east China‘s Jiangsu Province, May 27, 2021. According to data released by the National Bureau of Statistics (NBS), from January to April, the total profit of industrial enterprises above designated size in China reached 2.594.35 trillion yuan, up 1.06 times year on year, up 49.6 percent from January to April in 2019, and up 22.3 percent on average in the two years. Among them, in April, industrial enterprises above designated size achieved a total profit of 768.63 billion yuan, up by 57.0% year on year.=2021(令和3)年5月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021053109145

  •  China Jiangsu Lianyungang Port
    2021年05月27日
    China Jiangsu Lianyungang Port

    A large number of wind turbine blades are discharged at a port waiting for shipment in Lianyungang, east China‘s Jiangsu Province, May 27, 2021. According to data released by the National Bureau of Statistics (NBS), from January to April, the total profit of industrial enterprises above designated size in China reached 2.594.35 trillion yuan, up 1.06 times year on year, up 49.6 percent from January to April in 2019, and up 22.3 percent on average in the two years. Among them, in April, industrial enterprises above designated size achieved a total profit of 768.63 billion yuan, up by 57.0% year on year.=2021(令和3)年5月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021053109143

  •  China Jiangsu Lianyungang Port
    2021年05月27日
    China Jiangsu Lianyungang Port

    A large number of wind turbine blades are discharged at a port waiting for shipment in Lianyungang, east China‘s Jiangsu Province, May 27, 2021. According to data released by the National Bureau of Statistics (NBS), from January to April, the total profit of industrial enterprises above designated size in China reached 2.594.35 trillion yuan, up 1.06 times year on year, up 49.6 percent from January to April in 2019, and up 22.3 percent on average in the two years. Among them, in April, industrial enterprises above designated size achieved a total profit of 768.63 billion yuan, up by 57.0% year on year.=2021(令和3)年5月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021053109133

  •  China Jiangsu Lianyungang Port
    2021年05月27日
    China Jiangsu Lianyungang Port

    A large number of wind turbine blades are discharged at a port waiting for shipment in Lianyungang, east China‘s Jiangsu Province, May 27, 2021. According to data released by the National Bureau of Statistics (NBS), from January to April, the total profit of industrial enterprises above designated size in China reached 2.594.35 trillion yuan, up 1.06 times year on year, up 49.6 percent from January to April in 2019, and up 22.3 percent on average in the two years. Among them, in April, industrial enterprises above designated size achieved a total profit of 768.63 billion yuan, up by 57.0% year on year.=2021(令和3)年5月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021053109080

  •  Wind Turbine Blade
    2021年06月16日
    Wind Turbine Blade

    June 16, 2021, Adair, Iowa, USA: Adair, Iowa - A wind turbine blade displayed at a rest area on Interstate 80. As of 2021, wind energy made up nearly two-thirds of the electricity generated in Iowa. (Credit Image: © Jim West/ZUMA Press Wire)、クレジット:©Jim West/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2021081202354

  •  Lianyungang Port Cargo Throughput Growth
    2021年08月27日
    Lianyungang Port Cargo Throughput Growth

    A large number of wind turbine blades are discharged at the Port of Dongfang Company in Lianyungang, East China‘s Jiangsu Province, Aug. 27, 2021. In the first seven months, profits of industrial enterprises above designated size increased by 57.3% year on year=2021(令和3)年8月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021082801192

  •  Lianyungang Port Cargo Throughput Growth
    2021年08月27日
    Lianyungang Port Cargo Throughput Growth

    A large number of wind turbine blades are discharged at the Port of Dongfang Company in Lianyungang, East China‘s Jiangsu Province, Aug. 27, 2021. In the first seven months, profits of industrial enterprises above designated size increased by 57.3% year on year=2021(令和3)年8月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021082801496

  •  Lianyungang Port Cargo Throughput Growth
    2021年08月27日
    Lianyungang Port Cargo Throughput Growth

    A large number of wind turbine blades are discharged at the Port of Dongfang Company in Lianyungang, East China‘s Jiangsu Province, Aug. 27, 2021. In the first seven months, profits of industrial enterprises above designated size increased by 57.3% year on year=2021(令和3)年8月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021082801221

  •  China Imports And Exports Value Rose In The First Eight Months
    2021年09月07日
    China Imports And Exports Value Rose In The First Eight Months

    A large number of wind turbine blades are stacked at the Port of Lianyungang Eastern Company for shipment in Lianyungang, East China‘s Jiangsu Province, Sept. 7, 2021. In the first eight months of this year, China‘s import and export value was 24.78 trillion yuan, up 23.7 percent year on year.=2021(令和3)年9月7日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2021092104419

  •  Xinhua Headlines: China on fast track to cut energy consumption intensity
    2021年11月02日
    Xinhua Headlines: China on fast track to cut energy consumption intensity

    (211102) -- BEIJING, Nov. 2, 2021 (Xinhua) -- Wind turbine blades await shipping at Lianyungang Port, east China‘s Jiangsu province, April 16, 2021. (Photo by Wang Chun/Xinhua)、クレジット:新華社/共同通信イメージズ

    商品コード: 2021110404152

  •  Xinhua Headlines: COP26 ends with new global pact, developed countries urged to pay climate debt
    2021年11月14日
    Xinhua Headlines: COP26 ends with new global pact, developed countries urged to pay climate debt

    (211114) -- GLASGOW, Nov. 14, 2021 (Xinhua) -- Wind turbine blades await shipping at Lianyungang Port in east China‘s Jiangsu Province, April 16, 2021. (Photo by Wang Chun/Xinhua)、クレジット:新華社/共同通信イメージズ

    商品コード: 2021111608715

  •  「新華社」先人の知恵を垣間見る、宝鶏青銅器博物院を訪ねて陝西省
    01:05.08
    2021年12月12日
    「新華社」先人の知恵を垣間見る、宝鶏青銅器博物院を訪ねて陝西省

    中国陝西省宝鶏市の宝鶏青銅器博物院では、青銅器の鋳造工程を再現した展示を通じて、先人の知恵を垣間見ることができる。専門家によると、中国の青銅器の鋳造技法は主に「陶模(とうも)法」と「ろう型法」に分けられる。陶模法は商(殷)・周代に広く用いられ、ろう型法はおおよそ春秋時代に確立されたと考えられている。現在でも、ハイテク航空機の部品やタービンブレードにろう型法を改良した技法が用いられており、先端技術を駆使した製品だけでなく、日常生活の中でもよく使われている。(記者/賀占軍、梁愛平、姚友明、張思潔) =配信日: 2021(令和3)年12月12日、クレジット:新華社/共同通信イメージズ

    商品コード: 2021121311979

  •  Russia Wind Farm Construction
    2022年03月23日
    Russia Wind Farm Construction

    8148332 23.03.2022 A truck transports a wind turbine blade to the Kola wind farm in Murmansk region, Russia. The Kola wind farm will be the largest wind farm in Russia beyond the Arctic Circle and will be able to generate about 750 GWh per year. Pavel Lvov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2022040102534

  •  Siemens Gamesa offshore wind turbine production plant..
    2022年04月14日
    Siemens Gamesa offshore wind turbine production plant..

    April 14, 2022, Le Havre, France, France: Le Havre, France April 14, 2022 - Siemens Gamesa offshore wind turbine production plant. Located on a 36-hectare site in the Port of Le Havre, the Siemens Gamesa plant is the first in the world to combine the production of offshore wind turbine blades and the assembly of nacelles on a single site. ..USINE DE PRODUCTION D EOLIENNES EN MER, OFFSHORE, INDUSTRIE, EMPLOI, LE HAVRE, ENERGIE VERTE, RECHAUFFEMENT CLIMATIQUE, ILLUSTRATION, GENERIQUE, ELECTRICITE, PARC EOLIEN, ECONOMIE, ENERGIES RENOUVELABLES, (Credit Image: © Vincent Isore/IP3 via ZUMA Press)、クレジット:©Vincent Isore/IP3 via ZUMA Press/共同通信イメージズ ※Belgium, Denmark, France and Germany Out

    商品コード: 2022042202706

  •  Siemens Gamesa offshore wind turbine production plant..
    2022年04月14日
    Siemens Gamesa offshore wind turbine production plant..

    April 14, 2022, Le Havre, France, France: Le Havre, France April 14, 2022 - Siemens Gamesa offshore wind turbine production plant. Located on a 36-hectare site in the Port of Le Havre, the Siemens Gamesa plant is the first in the world to combine the production of offshore wind turbine blades and the assembly of nacelles on a single site. ..USINE DE PRODUCTION D EOLIENNES EN MER, OFFSHORE, INDUSTRIE, EMPLOI, LE HAVRE, ENERGIE VERTE, RECHAUFFEMENT CLIMATIQUE, ILLUSTRATION, GENERIQUE, ELECTRICITE, PARC EOLIEN, ECONOMIE, ENERGIES RENOUVELABLES, (Credit Image: © Vincent Isore/IP3 via ZUMA Press)、クレジット:©Vincent Isore/IP3 via ZUMA Press/共同通信イメージズ ※Belgium, Denmark, France and Germany Out

    商品コード: 2022042202711

  •  Siemens Gamesa offshore wind turbine production plant..
    2022年04月14日
    Siemens Gamesa offshore wind turbine production plant..

    April 14, 2022, Le Havre, France, France: Le Havre, France April 14, 2022 - Siemens Gamesa offshore wind turbine production plant. Located on a 36-hectare site in the Port of Le Havre, the Siemens Gamesa plant is the first in the world to combine the production of offshore wind turbine blades and the assembly of nacelles on a single site. ..USINE DE PRODUCTION D EOLIENNES EN MER, OFFSHORE, INDUSTRIE, EMPLOI, LE HAVRE, ENERGIE VERTE, RECHAUFFEMENT CLIMATIQUE, ILLUSTRATION, GENERIQUE, ELECTRICITE, PARC EOLIEN, ECONOMIE, ENERGIES RENOUVELABLES, (Credit Image: © Vincent Isore/IP3 via ZUMA Press)、クレジット:©Vincent Isore/IP3 via ZUMA Press/共同通信イメージズ ※Belgium, Denmark, France and Germany Out

    商品コード: 2022042202607

  •  Siemens Gamesa offshore wind turbine production plant..
    2022年04月14日
    Siemens Gamesa offshore wind turbine production plant..

    April 14, 2022, Le Havre, France, France: Le Havre, France April 14, 2022 - Siemens Gamesa offshore wind turbine production plant. Located on a 36-hectare site in the Port of Le Havre, the Siemens Gamesa plant is the first in the world to combine the production of offshore wind turbine blades and the assembly of nacelles on a single site. ..USINE DE PRODUCTION D EOLIENNES EN MER, OFFSHORE, INDUSTRIE, EMPLOI, LE HAVRE, ENERGIE VERTE, RECHAUFFEMENT CLIMATIQUE, ILLUSTRATION, GENERIQUE, ELECTRICITE, PARC EOLIEN, ECONOMIE, ENERGIES RENOUVELABLES, (Credit Image: © Vincent Isore/IP3 via ZUMA Press)、クレジット:©Vincent Isore/IP3 via ZUMA Press/共同通信イメージズ ※Belgium, Denmark, France and Germany Out

    商品コード: 2022042202728

  •  Siemens Gamesa offshore wind turbine production plant..
    2022年04月14日
    Siemens Gamesa offshore wind turbine production plant..

    April 14, 2022, Le Havre, France, France: Le Havre, France April 14, 2022 - Siemens Gamesa offshore wind turbine production plant. Located on a 36-hectare site in the Port of Le Havre, the Siemens Gamesa plant is the first in the world to combine the production of offshore wind turbine blades and the assembly of nacelles on a single site. ..USINE DE PRODUCTION D EOLIENNES EN MER, OFFSHORE, INDUSTRIE, EMPLOI, LE HAVRE, ENERGIE VERTE, RECHAUFFEMENT CLIMATIQUE, ILLUSTRATION, GENERIQUE, ELECTRICITE, PARC EOLIEN, ECONOMIE, ENERGIES RENOUVELABLES, (Credit Image: © Vincent Isore/IP3 via ZUMA Press)、クレジット:©Vincent Isore/IP3 via ZUMA Press/共同通信イメージズ ※Belgium, Denmark, France and Germany Out

    商品コード: 2022042202731

  •  Siemens Gamesa offshore wind turbine production plant..
    2022年04月14日
    Siemens Gamesa offshore wind turbine production plant..

    April 14, 2022, Le Havre, France, France: Le Havre, France April 14, 2022 - Siemens Gamesa offshore wind turbine production plant. Located on a 36-hectare site in the Port of Le Havre, the Siemens Gamesa plant is the first in the world to combine the production of offshore wind turbine blades and the assembly of nacelles on a single site. ..USINE DE PRODUCTION D EOLIENNES EN MER, OFFSHORE, INDUSTRIE, EMPLOI, LE HAVRE, ENERGIE VERTE, RECHAUFFEMENT CLIMATIQUE, ILLUSTRATION, GENERIQUE, ELECTRICITE, PARC EOLIEN, ECONOMIE, ENERGIES RENOUVELABLES, (Credit Image: © Vincent Isore/IP3 via ZUMA Press)、クレジット:©Vincent Isore/IP3 via ZUMA Press/共同通信イメージズ ※Belgium, Denmark, France and Germany Out

    商品コード: 2022042202683

  •  China Manufacturing Industry
    2022年05月27日
    China Manufacturing Industry

    LIANYUNGANG, CHINA - MAY 12, 2022 - A large number of wind turbine blades are ready for shipment at the dock of Dongfang Company in Lianyungang, Jiangsu province, May 27, 2022. Data released by the National Bureau of Statistics showed that from January to April, the total profits of industrial enterprises above designated size reached 2,658.23 billion yuan, up 3.5% year on year.=2022(令和4)年5月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022100510779

  •  China Manufacturing Industry
    2022年05月27日
    China Manufacturing Industry

    LIANYUNGANG, CHINA - MAY 12, 2022 - A large number of wind turbine blades are ready for shipment at the dock of Dongfang Company in Lianyungang, Jiangsu province, May 27, 2022. Data released by the National Bureau of Statistics showed that from January to April, the total profits of industrial enterprises above designated size reached 2,658.23 billion yuan, up 3.5% year on year.=2022(令和4)年5月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022100510843

  •  Longest Wind Turbine Blade
    2022年06月10日
    Longest Wind Turbine Blade

    LIANYUNGANG, CHINA - JUNE 10, 2022 - A wind turbine blade is tested under static load on the test platform of the Key Laboratory of Offshore Wind Turbine Blade Design and Manufacturing Technology in Lianyungang city, Jiangsu Province, China, June 10, 2022. The 110-meter-long blade integrates high-strength embedded blade root, 2.0 lightning protection system and pultruded carbon plate main beam technology, and adopts synchronous precast process to further improve the reliability and stability of the blade. The blades can generate enough electricity to power about 56,000 homes and reduce carbon dioxide emissions by 56,000 tons per year, boosting the goal of “peak carbon neutrality“.=2022(令和4)年6月10日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022061610067

  •  Longest Wind Turbine Blade
    2022年06月10日
    Longest Wind Turbine Blade

    LIANYUNGANG, CHINA - JUNE 10, 2022 - A wind turbine blade is tested under static load on the test platform of the Key Laboratory of Offshore Wind Turbine Blade Design and Manufacturing Technology in Lianyungang city, Jiangsu Province, China, June 10, 2022. The 110-meter-long blade integrates high-strength embedded blade root, 2.0 lightning protection system and pultruded carbon plate main beam technology, and adopts synchronous precast process to further improve the reliability and stability of the blade. The blades can generate enough electricity to power about 56,000 homes and reduce carbon dioxide emissions by 56,000 tons per year, boosting the goal of “peak carbon neutrality“.=2022(令和4)年6月10日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022061610112

  •  Longest Wind Turbine Blade
    2022年06月10日
    Longest Wind Turbine Blade

    LIANYUNGANG, CHINA - JUNE 10, 2022 - A wind turbine blade is tested under static load on the test platform of the Key Laboratory of Offshore Wind Turbine Blade Design and Manufacturing Technology in Lianyungang city, Jiangsu Province, China, June 10, 2022. The 110-meter-long blade integrates high-strength embedded blade root, 2.0 lightning protection system and pultruded carbon plate main beam technology, and adopts synchronous precast process to further improve the reliability and stability of the blade. The blades can generate enough electricity to power about 56,000 homes and reduce carbon dioxide emissions by 56,000 tons per year, boosting the goal of “peak carbon neutrality“.=2022(令和4)年6月10日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022061610008

  •  Longest Wind Turbine Blade
    2022年06月10日
    Longest Wind Turbine Blade

    LIANYUNGANG, CHINA - JUNE 10, 2022 - A wind turbine blade is tested under static load on the test platform of the Key Laboratory of Offshore Wind Turbine Blade Design and Manufacturing Technology in Lianyungang city, Jiangsu Province, China, June 10, 2022. The 110-meter-long blade integrates high-strength embedded blade root, 2.0 lightning protection system and pultruded carbon plate main beam technology, and adopts synchronous precast process to further improve the reliability and stability of the blade. The blades can generate enough electricity to power about 56,000 homes and reduce carbon dioxide emissions by 56,000 tons per year, boosting the goal of “peak carbon neutrality“.=2022(令和4)年6月10日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022061610027

  •  Longest Wind Turbine Blade
    2022年06月10日
    Longest Wind Turbine Blade

    LIANYUNGANG, CHINA - JUNE 10, 2022 - A wind turbine blade is tested under static load on the test platform of the Key Laboratory of Offshore Wind Turbine Blade Design and Manufacturing Technology in Lianyungang city, Jiangsu Province, China, June 10, 2022. The 110-meter-long blade integrates high-strength embedded blade root, 2.0 lightning protection system and pultruded carbon plate main beam technology, and adopts synchronous precast process to further improve the reliability and stability of the blade. The blades can generate enough electricity to power about 56,000 homes and reduce carbon dioxide emissions by 56,000 tons per year, boosting the goal of “peak carbon neutrality“.=2022(令和4)年6月10日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022061610171

  •  China Manufacturing Industry
    2022年06月15日
    China Manufacturing Industry

    LIANYUNGANG, CHINA - JUNE 15, 2022 - A worker looks at wind turbine blades ready for shipment at the Port of Dongfang Company in Lianyungang, China, June 15, 2022. Industrial production rose 0.7 percent year-on-year in May, the National Bureau of Statistics (NBS) said Tuesday. On a month-on-month basis, the added value of industrial enterprises above designated size increased by 5.61 percent in May compared with the previous month. From January to May, the added value of industrial enterprises above designated size increased by 3.3 percent year-on-year.=2022(令和4)年6月15日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022061609807

  •  China Manufacturing Industry
    2022年06月15日
    China Manufacturing Industry

    LIANYUNGANG, CHINA - JUNE 15, 2022 - A worker looks at wind turbine blades ready for shipment at the Port of Dongfang Company in Lianyungang, China, June 15, 2022. Industrial production rose 0.7 percent year-on-year in May, the National Bureau of Statistics (NBS) said Tuesday. On a month-on-month basis, the added value of industrial enterprises above designated size increased by 5.61 percent in May compared with the previous month. From January to May, the added value of industrial enterprises above designated size increased by 3.3 percent year-on-year.=2022(令和4)年6月15日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022061609781

  •  China Manufacturing Industry
    2022年06月15日
    China Manufacturing Industry

    LIANYUNGANG, CHINA - JUNE 15, 2022 - A worker looks at wind turbine blades ready for shipment at the Port of Dongfang Company in Lianyungang, China, June 15, 2022. Industrial production rose 0.7 percent year-on-year in May, the National Bureau of Statistics (NBS) said Tuesday. On a month-on-month basis, the added value of industrial enterprises above designated size increased by 5.61 percent in May compared with the previous month. From January to May, the added value of industrial enterprises above designated size increased by 3.3 percent year-on-year.=2022(令和4)年6月15日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022061609780

  •  Wind Power Distribution Center
    2022年07月04日
    Wind Power Distribution Center

    September 14, 2017, Garden City, Kansas, USA: Garden City, Kansas - Wind turbine blades and other turbine parts are stored at the Wind Power Component Distribution Center operated by Transportation Partners and Logistics (Credit Image: © Jim West/ZUMA Press Wire)、クレジット:©Jim West/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2022072306923

  •  Wind Power Distribution Center
    2022年07月04日
    Wind Power Distribution Center

    September 14, 2017, Garden City, Kansas, USA: Garden City, Kansas - Wind turbine blades and other turbine parts are stored at the Wind Power Component Distribution Center operated by Transportation Partners and Logistics (Credit Image: © Jim West/ZUMA Press Wire)、クレジット:©Jim West/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2022072306970

  •  Wind Power Distribution Center
    2022年07月04日
    Wind Power Distribution Center

    September 14, 2017, Garden City, Kansas, USA: Garden City, Kansas - Wind turbine blades and other turbine parts are stored at the Wind Power Component Distribution Center operated by Transportation Partners and Logistics (Credit Image: © Jim West/ZUMA Press Wire)、クレジット:©Jim West/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2022072306894

  •  China Q2 GDP Growth
    2022年07月15日
    China Q2 GDP Growth

    HANDAN, CHINA - JULY 15, 2022 - Aerial photo taken on July 15, 2022 shows workers driving construction machinery at a wind turbine blade production company in Jinan New District of Handan city, North China‘s Hebei Province. China‘s GDP grew 2.5 percent year-on-year in the first half of the year, including 0.4 percent in the second quarter, the National Bureau of Statistics (NBS) said on Tuesday.=2022(令和4)年7月15日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022072105013

  •  China Q2 GDP Growth
    2022年07月15日
    China Q2 GDP Growth

    HANDAN, CHINA - JULY 15, 2022 - Aerial photo taken on July 15, 2022 shows workers driving construction machinery at a wind turbine blade production company in Jinan New District of Handan city, North China‘s Hebei Province. China‘s GDP grew 2.5 percent year-on-year in the first half of the year, including 0.4 percent in the second quarter, the National Bureau of Statistics (NBS) said on Tuesday.=2022(令和4)年7月15日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022072105605

  •  Gaotai, Gansu: New energy ‘‘wind‘‘ is in full swing
    2022年09月09日
    Gaotai, Gansu: New energy ‘‘wind‘‘ is in full swing

    September 8, 2022, China: On September 6, 2022, engineers and technicians are busy hoisting wind turbine blades at the Beitan 500 MW wind power base in Gaotai County, Zhangye City, Gansu Province... For the past few days, engineers and technicians have been busy debugging, hoisting and installing 30 wind turbines at the 500 MW wind power industry base in Beitan, Gaotai County, Zhangye City, Gansu Province, to ensure grid-connected power generation by the end of the year... It is reported that there are more than 2,000 square kilometers of Gobi Desert in Gaotai County. The terrain is narrow in the east and wide in the west, forming a special atmospheric circulation and terrain. It is rich in wind energy resources, and has obvious advantages in developing new energy by ‘‘taking advantage of the wind‘‘. The 500-megawatt wind power project is under construction. Among them, it is planned to connect to the grid for power generation by the end of the year, which can generate 1.29 billion kWh of electrici...

    商品コード: 2022091204329

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909673

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909618

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909765

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909492

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909574

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909629

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909557

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909595

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909603

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909517

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909616

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909614

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909497

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909636

  •  World‘s Longest Wind Blade
    2022年09月27日
    World‘s Longest Wind Blade

    LIANYUNGANG, CHINA - SEPTEMBER 27, 2022 - Workers hoist the world‘s longest wind turbine blade in Lianyungang, Jiangsu province, China, on Sept 27, 2022. The blades weigh 62 tons and are 123 meters long, making them the world‘s longest.=2022(令和4)年9月27日、クレジット:CFOTO/共同通信イメージズ

    商品コード: 2022092909758

  •  CHINA-INNER MONGOLIA-PRODUCTION (CN)
    2023年02月10日
    CHINA-INNER MONGOLIA-PRODUCTION (CN)

    (230209) -- HOHHOT, Feb. 9, 2023 (Xinhua) -- Staff members work at the production line of wind turbine blade at an energy company in Ulanqab, north China‘s Inner Mongolia Autonomous Region, Feb. 9, 2023. (Xinhua/Lian Zhen)= 配信日: 2023(令和5)年2月10日、クレジット:新華社/共同通信イメージズ

    商品コード: 2023021000353

  •  CHINA-INNER MONGOLIA-PRODUCTION (CN)
    2023年02月10日
    CHINA-INNER MONGOLIA-PRODUCTION (CN)

    (230209) -- HOHHOT, Feb. 9, 2023 (Xinhua) -- Staff members work at the production line of wind turbine blade at an energy company in Ulanqab, north China‘s Inner Mongolia Autonomous Region, Feb. 9, 2023. (Xinhua/Lian Zhen)= 配信日: 2023(令和5)年2月10日、クレジット:新華社/共同通信イメージズ

    商品コード: 2023021000346

  •  CHINA-INNER MONGOLIA-PRODUCTION (CN)
    2023年02月10日
    CHINA-INNER MONGOLIA-PRODUCTION (CN)

    (230209) -- HOHHOT, Feb. 9, 2023 (Xinhua) -- Staff members work at the production line of wind turbine blade at an energy company in Ulanqab, north China‘s Inner Mongolia Autonomous Region, Feb. 9, 2023. (Xinhua/Lian Zhen)= 配信日: 2023(令和5)年2月10日、クレジット:新華社/共同通信イメージズ

    商品コード: 2023021000350

  • 1
  • 2
  • 3
  • 4