KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00

「ファンゲント」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
並び順
  • 古い順
9
( 1 9 件を表示)
  • 1
9
( 1 9 件を表示)
絞り込み
並び順
  • 古い順
  •  Capture of Sas van Gent by Frederik Hendrik, Silver Medal.
    -
    Capture of Sas van Gent by Frederik Hendrik, Silver Medal.

    Capture of Sas van Gent by Frederik Hendrik, Silver Medal. Front: map of the captured fortress. Reverse: inscription within a wreath of arrows and orange branches within an inscription, Sas-van-Gent, Zeeland, Frederik Hendrik (Prince of Orange), Johannes Looff, Middelburg, 1644, silver (metal), striking (metalworking), d 6 cm × w 62.21 gr.、クレジット:Album/quintlox/共同通信イメージズ ※エディトリアル使用のみ。表紙、広告、プロモーション、商業目的での利用はお問合せください。クレジットは必ず表記してください。

    商品コード: 2023051108439

  •  Construction work on new sheet piling in the museum harbour Greifswald
    2020年10月26日
    Construction work on new sheet piling in the museum harbour Greifswald

    26 October 2020, Mecklenburg-Western Pomerania, Greifswald: Construction machinery is being used to work on a sheet pile wall in the museum harbour along the Hansering. The bank reinforcement of the Ryck between the Steinbecker Bridge and the square Am Fangenturm is being renovated. The old sheet pile wall, which dates from the second half of the 19th century and is partly still in its original state, is no longer stable. The total cost of the project amounts to 6.6 million euros. Completion is planned for summer 2021. Photo: Stefan Sauer/dpa-Zentralbild/dpa、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020102808043

  •  Construction work on new sheet piling in the museum harbour Greifswald
    2020年10月26日
    Construction work on new sheet piling in the museum harbour Greifswald

    26 October 2020, Mecklenburg-Western Pomerania, Greifswald: Construction machinery is being used to work on a sheet pile wall in the museum harbour along the Hansering. The bank reinforcement of the Ryck between the Steinbecker Bridge and the square Am Fangenturm is being renovated. The old sheet pile wall, which dates from the second half of the 19th century and is partly still in its original state, is no longer stable. The total cost of the project amounts to 6.6 million euros. Completion is planned for summer 2021. Photo: Stefan Sauer/dpa-Zentralbild/dpa、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020102808527

  •  Construction work on new sheet piling in the museum harbour Greifswald
    2020年10月26日
    Construction work on new sheet piling in the museum harbour Greifswald

    26 October 2020, Mecklenburg-Western Pomerania, Greifswald: Construction machinery is being used to work on a sheet pile wall in the museum harbour along the Hansering. The bank reinforcement of the Ryck between the Steinbecker Bridge and the square Am Fangenturm is being renovated. The old sheet pile wall, which dates from the second half of the 19th century and is partly still in its original state, is no longer stable. The total cost of the project amounts to 6.6 million euros. Completion is planned for summer 2021. Photo: Stefan Sauer/dpa-Zentralbild/dpa、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020102808328

  •  Construction work on new sheet piling in the museum harbour Greifswald
    2020年10月26日
    Construction work on new sheet piling in the museum harbour Greifswald

    26 October 2020, Mecklenburg-Western Pomerania, Greifswald: Construction machinery is being used to work on a sheet pile wall in the museum harbour along the Hansering. The bank reinforcement of the Ryck between the Steinbecker Bridge and the square Am Fangenturm is being renovated. The old sheet pile wall, which dates from the second half of the 19th century and is partly still in its original state, is no longer stable. The total cost of the project amounts to 6.6 million euros. Completion is planned for summer 2021. Photo: Stefan Sauer/dpa-Zentralbild/dpa、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020102808158

  •  BMX 2021, UEC European Cup, Rounds 1-2
    2021年04月24日
    BMX 2021, UEC European Cup, Rounds 1-2

    April 24, 2021, Verona, Veneto, Italy: Reigning World Champion TWAN VAN GENDT of Netherlands during a practice session on April 24, 2021 in Verona, Italy (Credit Image: © Mickael Chavet via ZUMA Wire)、クレジット:©Mickael Chavet via ZUMA Wire/共同通信イメージズ

    商品コード: 2021042505269

  •  BMX 2021, UEC European Cup, Rounds 1-2
    2021年04月24日
    BMX 2021, UEC European Cup, Rounds 1-2

    April 24, 2021, Verona, Veneto, Italy: Reigning World Champion TWAN VAN GENDT of Netherlands during a practice session on April 24, 2021 in Verona, Italy (Credit Image: © Mickael Chavet via ZUMA Wire)、クレジット:©Mickael Chavet via ZUMA Wire/共同通信イメージズ

    商品コード: 2021042504123

  •  BMX 2021, UEC European Cup, Rounds 1-2
    2021年04月24日
    BMX 2021, UEC European Cup, Rounds 1-2

    April 24, 2021, Verona, Veneto, Italy: Reigning World Champion TWAN VAN GENDT of Netherlands during a practice session on April 24, 2021 in Verona, Italy (Credit Image: © Mickael Chavet via ZUMA Wire)、クレジット:©Mickael Chavet via ZUMA Wire/共同通信イメージズ

    商品コード: 2021042504794

  •  BMX Racing 2021: European Cup Italy
    2021年05月02日
    BMX Racing 2021: European Cup Italy

    May 2, 2021, Verona, Veneto, Italy: Reigning BMX World Champion TWAN VAN GENDT from Netherlands fell and badly injured his right shoulder in the last 16 of BMX Racing Men Elite Round 2 of the UEC European Cup at the BMX Olympic Arena on May 2nd 2021 in Verona, Italy. The event later got cancelled because of the rain (Credit Image: © Mickael Chavet via ZUMA Wire)、クレジット:©Mickael Chavet via ZUMA Wire/共同通信イメージズ

    商品コード: 2021050805818

  • 1