KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00
  • 新型コロナウイルス
  • 新型肺炎
  • ウンター・デン・リンデン
  • パリ広場
  • ベルリン王宮
  • 付近
  • 令和
  • 入口
  • 場所
  • 夜景

「ベルリンSバーン」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
  • 同義語オン
並び順
  • 古い順
88
( 1 88 件を表示)
  • 1
88
( 1 88 件を表示)
絞り込み
並び順
  • 古い順
  •  Deutsche Bahn pushes ahead with construction of Dresden Railway
    2018年10月19日
    Deutsche Bahn pushes ahead with construction of Dresden Railway

    19 October 2018, Berlin: An S-Bahn runs along the future route of the Dresdner Bahn between the S-Bahn station Lichtenrade and the border Berlin-Brandenburg. (to “Railway is driving the construction of the Dresden railway“ from 20.10.2018) Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018102432338

  •  Deutsche Bahn pushes ahead with construction of Dresden Railway
    2018年10月19日
    Deutsche Bahn pushes ahead with construction of Dresden Railway

    19 October 2018, Berlin: Posts for noise barriers are located in the section between the Lichtenrade S-Bahn station and the Berlin-Brandenburg border along the future route of the Dresden Railway, while an S-Bahn passes by. (to “Railway is driving the construction of the Dresden railway“ from 20.10.2018) Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018102432337

  •  Deutsche Bahn pushes ahead with construction of Dresden Railway
    2018年10月19日
    Deutsche Bahn pushes ahead with construction of Dresden Railway

    19 October 2018, Berlin: Construction workers are waiting for a drill on the future route of the Dresden Railway in the section between the Lichtenrade S-Bahn station and the Berlin-Brandenburg border, while an S-Bahn passes by. Deutsche Bahn is pushing ahead with the expansion of the line in the direction of Dresden and the BER in the south of Berlin. (to “Railway is driving the construction of the Dresden railway“ from 20.10.2018) Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018102432107

  •  Deutsche Bahn pushes ahead with construction of Dresden Railway
    2018年10月19日
    Deutsche Bahn pushes ahead with construction of Dresden Railway

    19 October 2018, Berlin: A construction worker is standing on the future route of the Dresdner Bahn in the section between the S-Bahn station Lichtenrade and the border Berlin-Brandenburg between a drill and a passing S-Bahn. Deutsche Bahn is pushing ahead with the expansion of the line. (to “Railway is driving the construction of the Dresden railway“ from 20.10.2018) Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018102432426

  •  Deutsche Bahn pushes ahead with construction of Dresden Railway
    2018年10月19日
    Deutsche Bahn pushes ahead with construction of Dresden Railway

    19 October 2018, Berlin: Construction workers are waiting for a drill on the future route of the Dresden Railway in the section between the Lichtenrade S-Bahn station and the Berlin-Brandenburg border, while an S-Bahn passes by. Deutsche Bahn is pushing ahead with the expansion of the line in the direction of Dresden and the BER in the south of Berlin. (to “Railway is driving the construction of the Dresden railway“ from 20.10.2018) Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018102432241

  •  Deutsche Bahn pushes ahead with construction of Dresden Railway
    2018年10月19日
    Deutsche Bahn pushes ahead with construction of Dresden Railway

    19 October 2018, Berlin: Posts for noise barriers are located in the section between the Lichtenrade S-Bahn station and the Berlin-Brandenburg border along the future route of the Dresden Railway, while an S-Bahn passes by. (Wiping effect due to long-term exposure). (to “Railway is driving the construction of the Dresden railway“ from 20.10.2018) Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018102432424

  •  City views Berlin - S-Bahn
    2018年11月29日
    City views Berlin - S-Bahn

    29 November 2018, Berlin: There is a suburban train near Alexanderplatz. (Wiping effect by pulling along). Photo: Christoph Soeder/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2018120405506

  •  Ostkreuz railway station shortly before completion
    2018年12月06日
    Ostkreuz railway station shortly before completion

    06 December 2018, Berlin: Two trains of the S-Bahn Berlin GmbH are standing at platforms of the station Ostkreuz and wait as S-Bahn line 75 for passengers. Photo: Gregor Fischer/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018121600501

  •  Ostkreuz railway station shortly before completion
    2018年12月06日
    Ostkreuz railway station shortly before completion

    06 December 2018, Berlin: A train of the S-Bahn Berlin GmbH stands at a platform of the station Ostkreuz and waits as S-Bahn line 75 for passengers. Photo: Gregor Fischer/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018120734328

  •  S-Bahn Station Berlin Karlshorst
    2018年12月25日
    S-Bahn Station Berlin Karlshorst

    25 December 2018, Berlin: Sign at the S-Bahn station Berlin Karlshorst, taken in the evening. After the damage to an overhead line in Berlin-Karlshorst, police re-examined the suspected crime scene on 25 December. According to the railway, the regional railway line between the Wuhlheide and Karlshorst S-Bahn stations was closed due to the operation. Three regional trains were diverted via Lichtenberg station. (to dpa “Damaged overhead line in Karlshorst - crime scene investigated again“ of 25.12.2018) Photo: Fabian Fuchs/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2018122622173

  •  Berlin night shot
    2019年02月09日
    Berlin night shot

    09 February 2019, Berlin: The Alexanderplatz between the S-Bahn stations and the television tower at the blue hour. The Park-Inn in the background. Photo: Annette Riedl/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019021408955

  •  Train station Berlin-Charlottenburg
    2019年03月06日
    Train station Berlin-Charlottenburg

    06 March 2019, Berlin: Charlottenburg station for S-Bahn and regional trains. Photo: Soeren Stache/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019031206692

  •  Train station Berlin-Charlottenburg
    2019年03月06日
    Train station Berlin-Charlottenburg

    06 March 2019, Berlin: Platforms for S-Bahn and regional trains at Charlottenburg station. Photo: Soeren Stache/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019031206603

  •  Train station Berlin-Charlottenburg
    2019年03月06日
    Train station Berlin-Charlottenburg

    06 March 2019, Berlin: Charlottenburg station for S-Bahn and regional trains. On the forecourt there is a building fence with the inscription “Smart City“. Photo: Soeren Stache/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019031206634

  •  Train station Berlin-Charlottenburg
    2019年03月06日
    Train station Berlin-Charlottenburg

    06 March 2019, Berlin: Charlottenburg station for S-Bahn and regional trains. On the forecourt there is a building fence with the inscription “Smart City“. Photo: Soeren Stache/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019031206510

  •  Train station Berlin-Charlottenburg
    2019年03月06日
    Train station Berlin-Charlottenburg

    06 March 2019, Berlin: Platforms for S-Bahn and regional trains at Charlottenburg station. Photo: Soeren Stache/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019031206672

  •  Berliner S-Bahn presents new driving simulator
    2019年03月15日
    Berliner S-Bahn presents new driving simulator

    15 March 2019, Berlin: Peter Buchner, CEO of the S-Bahn Berlin, sits at the presentation of the new driving simulator of the Berliner S-Bahn for the train driver training in the virtual driver‘s cab in the S-Bahn factory Schöneweide. Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019032203916

  •  Berliner S-Bahn presents new driving simulator
    2019年03月15日
    Berliner S-Bahn presents new driving simulator

    15 March 2019, Berlin: Peter Buchner, CEO of the S-Bahn Berlin, sits at the presentation of the new driving simulator of the Berliner S-Bahn for the train driver training in the virtual driver‘s cab in the S-Bahn factory Schöneweide. Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019032203850

  •  Driving simulator Berlin S-Bahn
    2019年03月15日
    Driving simulator Berlin S-Bahn

    15 March 2019, Berlin: Tobias Hirsch (l), aspirant for the locomotive driving licence, and Peter Buchner, Chairman of the Management Board of S-Bahn Berlin, present the new driving simulator for the train driver training of the Berlin S-Bahn in the virtual driver‘s cab at the Schöneweide S-Bahn plant. Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019032203860

  •  Driving simulator Berlin S-Bahn
    2019年03月15日
    Driving simulator Berlin S-Bahn

    15 March 2019, Berlin: Tobias Hirsch (l), aspirant for the locomotive driving licence, and Peter Buchner, Chairman of the Management Board of S-Bahn Berlin, present the new driving simulator for the train driver training of the Berlin S-Bahn in the virtual driver‘s cab at the Schöneweide S-Bahn plant. Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019032203851

  •  Full-day warning strike at the Berlin public transport company (BVG)
    2019年04月01日
    Full-day warning strike at the Berlin public transport company (BVG)

    01 April 2019, Berlin: An S-Bahn leaves the station Friedrichstra゚e. There were no subways and trams in the capital, and most buses remained in the depots. Only the commuter train runs. Photo: Kay Nietfeld/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019040206365

  •  Full-day warning strike at the Berlin public transport company (BVG)
    2019年04月01日
    Full-day warning strike at the Berlin public transport company (BVG)

    01 April 2019, Berlin: The passengers are densely packed at the entrances to the S-Bahn at Friedrichstra゚e station. There were no subways and trams in the capital, and most buses remained in the depots. Only the commuter train runs. Photo: Kay Nietfeld/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019040206369

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: View of the construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051704542

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: View of the construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051606626

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: View of the construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051704809

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: Ulrich Burkhardt, project manager of Deutsche Bahn, is standing during construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051606827

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: New tracks will be ground during construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051606859

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: New tracks will be ground during construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051704565

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: Ulrich Burkhardt, project manager of Deutsche Bahn, is standing during construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051606828

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: View of the construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051606762

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: View of the construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051704608

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: View of the construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051606805

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: View of the construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is to be completed on time on 20 May 2019. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051606862

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: New tracks will be ground during construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051704721

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: New tracks will be ground during construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051705102

  •  Construction work on the eastern Berlin S-Bahn Ring
    2019年05月15日
    Construction work on the eastern Berlin S-Bahn Ring

    15 May 2019, Berlin: New tracks will be ground during construction work on the eastern Berlin S-Bahn ring between Greifswalder Straße and Prenzlauer Allee. Since 8 April 2019, travellers have had to live with considerable restrictions. The work is due to be completed on 20 May. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019051704810

  •  Planning for S-Bahn line Siemensbahn
    2019年06月28日
    Planning for S-Bahn line Siemensbahn

    28 June 2019, Berlin: Peter Buchner, CEO of the S-Bahn Berlin, stands with journalists at a press event in the disused Siemensstadt station. In the course of the planned renovation of the former Siemensbahn, the building will also be repaired. Representatives of Deutsche Bahn and politicians signed a corresponding financing agreement. Photo: Paul Zinken/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019070204100

  •  S-Bahn station Baumschulenweg
    2019年07月15日
    S-Bahn station Baumschulenweg

    15 July 2019, Berlin: The entrance to the S-Bahn station Baumschulenweg. Photo: Jens Kalaene/dpa-Zentralbild/ZB、クレジット:DPA/共同通信イメージズ

    商品コード: 2019072302469

  •  ウンター・デン・リンデンで夜を満喫ドイツ・ベルリン
    2019年08月19日
    ウンター・デン・リンデンで夜を満喫ドイツ・ベルリン

    19日、ウンター・デン・リンデン沿いにあるベルリンSバーンの入口。ウンター・デン・リンデン(菩提樹の下)はドイツ・ベルリンの代表的な大通りの一つ。西のブランデンブルク門東側のパリ広場から、東へ約1・5キロのベルリン王宮まで続く。通り沿いやその付近には多くの名所旧跡や店舗が立ち並び、夜も地元住民や観光客にとって魅力的な場所となっている。(ベルリン=新華社記者/単宇琦)=2019(令和元)年8月19日、クレジット:新華社/共同通信イメージズ

    商品コード: 2019082203427

  •  Nocturnal measurement runs for the new Berlin suburban railway
    2019年09月18日
    Nocturnal measurement runs for the new Berlin suburban railway

    18 September 2019, Berlin: The new suburban train is standing at a station that night. Two test vehicles of the new S-Bahn trains are now on the road in Berlin at night. The blue adhesive tape fixes cables leading to measuring devices in the drive to the outer wall of the train. (to “Nocturnal measurement runs for the new Berlin S-Bahn“) Photo: Paul Zinken/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019092700550

  •  Nocturnal measurement runs for the new Berlin suburban railway
    2019年09月18日
    Nocturnal measurement runs for the new Berlin suburban railway

    18 September 2019, Berlin: The new S-Bahn travels through a station at night. Two test vehicles of the new S-Bahn trains are now on the road in Berlin at night. The blue adhesive tape fixes cables leading to measuring devices in the drive to the outer wall of the train. (to “Nocturnal measurement runs for the new Berlin S-Bahn“) Photo: Paul Zinken/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019092700562

  •  Nocturnal measurement runs for the new Berlin suburban railway
    2019年09月18日
    Nocturnal measurement runs for the new Berlin suburban railway

    18 September 2019, Berlin: The new suburban train is standing at a station that night. Two test vehicles of the new S-Bahn trains are now on the road in Berlin at night. The blue adhesive tape fixes cables leading to measuring devices in the drive to the outer wall of the train. (to “Nocturnal measurement runs for the new Berlin S-Bahn“) Photo: Paul Zinken/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019092700263

  •  Nocturnal measurement runs for the new Berlin suburban railway
    2019年09月18日
    Nocturnal measurement runs for the new Berlin suburban railway

    18 September 2019, Berlin: The new S-Bahn travels through a station at night. Two test vehicles of the new S-Bahn trains are now on the road in Berlin at night. (to “Nocturnal measurement runs for the new Berlin S-Bahn“) Photo: Paul Zinken/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019092700439

  •  S-Bahn S7
    2019年09月23日
    S-Bahn S7

    23 September 2019, Berlin: An S-Bahn travels through the forest between the Wannsee and Griebnitzsee stops. In the morning an S-Bahn had collided with a tree lying across the rails. After the site of the accident had been cleared, the railway was able to continue its journey. Photo: Soeren Stache/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019092605404

  •  S-Bahn S7
    2019年09月23日
    S-Bahn S7

    23 September 2019, Berlin: An S-Bahn travels through the forest between the Wannsee and Griebnitzsee stops. In the morning an S-Bahn had collided with a tree lying across the rails. After the site of the accident had been cleared, the railway was able to continue its journey. Photo: Soeren Stache/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019092605566

  •  S-Bahn Berlin presents retreaded series 481
    2019年10月22日
    S-Bahn Berlin presents retreaded series 481

    22 October 2019, Berlin: S-Bahn trains will be retreaded at the Schöneweide plant. In the guise of the 483/484 series, 309 vehicles of the 481 series (built between 1997 and 2004) will in future travel through Berlin and Brandenburg. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019102402730

  •  S-Bahn Berlin presents retreaded series 481
    2019年10月22日
    S-Bahn Berlin presents retreaded series 481

    22 October 2019, Berlin: S-Bahn trains will be retreaded at the Schöneweide plant. In the guise of the 483/484 series, 309 vehicles of the 481 series (built between 1997 and 2004) will in future travel through Berlin and Brandenburg. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019102403073

  •  S-Bahn Berlin presents retreaded series 481
    2019年10月22日
    S-Bahn Berlin presents retreaded series 481

    22 October 2019, Berlin: Peter Buchner, head of the S-Bahn, is at the Schöneweide plant. In the guise of the 483/484 series, 309 vehicles of the 481 series (built between 1997 and 2004) will in future travel through Berlin and Brandenburg. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019102402846

  •  S-Bahn Berlin presents retreaded series 481
    2019年10月22日
    S-Bahn Berlin presents retreaded series 481

    22 October 2019, Berlin: S-Bahn trains will be retreaded at the Schöneweide plant. In the guise of the 483/484 series, 309 vehicles of the 481 series (built between 1997 and 2004) will in future travel through Berlin and Brandenburg. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019102402367

  •  S-Bahn Berlin presents retreaded series 481
    2019年10月22日
    S-Bahn Berlin presents retreaded series 481

    22 October 2019, Berlin: Peter Buchner, head of the S-Bahn, is at the Schöneweide plant. In the guise of the 483/484 series, 309 vehicles of the 481 series (built between 1997 and 2004) will in future travel through Berlin and Brandenburg. Photo: Jörg Carstensen/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019102402439

  •  East station roof is being renovated
    2020年02月11日
    East station roof is being renovated

    11 February 2020, Berlin: Two S-Bahn trains and one regional train stop at Ostbahnhof. The renovation of the hall roof, which is over 100 years old, is being prepared with load-bearing supports on one side. The Berlin traffic junction with about 100000 daily is a stop for long-distance, regional and S-Bahn trains. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020021408232

  •  Ostbahnhof - Roof being renovated
    2020年02月11日
    Ostbahnhof - Roof being renovated

    11 February 2020, Berlin: Two S-Bahn trains stop at Ostbahnhof. The renovation of the hall roof, which is over 100 years old, is being prepared with load-bearing supports on one side. The Berlin transport hub is a stop for long-distance, regional and S-Bahn trains. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020022024570

  •  East station roof is being renovated
    2020年02月11日
    East station roof is being renovated

    11 February 2020, Berlin: Two S-Bahn trains and one regional train stop at Ostbahnhof. The renovation of the hall roof, which is over 100 years old, is being prepared with load-bearing supports on one side. The Berlin traffic junction with about 100000 daily is a stop for long-distance, regional and S-Bahn trains. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020021408230

  •  Pigeons in Berlin
    2020年02月19日
    Pigeons in Berlin

    19 February 2020, Berlin: Pigeons fly above Dorothea Schlegel Platz at the Friedrichstra゚e S-Bahn station. Photo: Lisa Ducret/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020022024399

  •  Local public transport
    2020年02月28日
    Local public transport

    28 February 2020, Berlin: People stand and walk on a platform of the Berlin S-Bahn. In the means of transport in cities, many people often meet in a dense crowd. Photo: Fernando Gutierrez-Juarez/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020030400469

  •  Local traffic in Berlin
    2020年03月03日
    Local traffic in Berlin

    03 March 2020, Berlin: View of tracks at the S-Bahn station Hackescher Markt, on which a S-Bahn and a train of the regional railways are running. Turn right into Dircksenstra゚e Photo: Jens Kalaene/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020030504665

  •  S-Bahn in Berlin
    2020年03月13日
    S-Bahn in Berlin

    13 March 2020, Berlin: An S-Bahn (suburban railway) enters the station Alexanderplatz. Photo: Kay Nietfeld/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020031800357

  •  Icon images - Coronavirus - 03/15/2020
    2020年03月15日
    Icon images - Coronavirus - 03/15/2020

    Berlin, Germany March 15, 2020: Symbols - Coronavirus - 15.03.2020 Corona, Berlin, S-Bahn, empty escalators, 15.03.2020 | usage worldwide、クレジット:Fotostand/DPA/共同通信イメージズ

    商品コード: 2020031703065

  •  Coronavirus - Berlin
    2020年03月20日
    Coronavirus - Berlin

    20 March 2020, Berlin: An S-Bahn is almost deserted at 7:30 in the morning. In order to slow down the spread of the novel coronavirus, the federal government has severely restricted public life. Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020032400309

  •  Coronavirus - Berlin
    2020年03月20日
    Coronavirus - Berlin

    20 March 2020, Berlin: An S-Bahn is almost deserted at 7:30 in the morning. In order to slow down the spread of the novel coronavirus, the federal government has severely restricted public life. Photo: Christoph Soeder/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020032400045

  •  Coronavirus - Berlin
    2020年03月26日
    Coronavirus - Berlin

    26 March 2020, Berlin: An S-Bahn (suburban train) leaves in the morning for the empty station at Tiergarten. In order to slow down the spread of the coronavirus, the federal government has severely restricted public life. Photo: Fabian Sommer/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020032800362

  •  Evening mood on the Berlin S-Bahn tracks
    2020年05月06日
    Evening mood on the Berlin S-Bahn tracks

    06.05.2020, Berlin, evening mood at sunset on the tracks of the Berlin S-Bahn. In the background the Berlin TV tower. | usage worldwide、クレジット:SULUPRESS.DE/DPA/共同通信イメージズ

    商品コード: 2020051400284

  •  Evening mood on the Berlin S-Bahn tracks
    2020年05月06日
    Evening mood on the Berlin S-Bahn tracks

    06.05.2020, Berlin, evening mood at sunset on the tracks of the Berlin S-Bahn. In the background the Berlin TV tower. View from the Warsaw bridge onto the tracks, in which the sunlight of the setting sun is reflected. | usage worldwide、クレジット:SULUPRESS.DE/DPA/共同通信イメージズ

    商品コード: 2020051400193

  •  Berlin S-Bahn put out to tender
    2020年05月27日
    Berlin S-Bahn put out to tender

    27 May 2020, Berlin: An S-Bahn (suburban train) enters the Tiergarten station. The Berlin Senate has approved the award procedure for the S-Bahn sub-networks North-South and Stadtbahn. Photo: Fabian Sommer/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020052900453

  •  Berlin S-Bahn put out to tender
    2020年05月27日
    Berlin S-Bahn put out to tender

    27 May 2020, Berlin: An S-Bahn (suburban train) enters the Tiergarten station. The Berlin Senate has approved the award procedure for the S-Bahn sub-networks North-South and Stadtbahn. Photo: Fabian Sommer/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020052900010

  •  Berlin S-Bahn put out to tender
    2020年05月27日
    Berlin S-Bahn put out to tender

    27 May 2020, Berlin: An S-Bahn (suburban train) enters the Tiergarten station. The Berlin Senate has approved the award procedure for the S-Bahn sub-networks North-South and Stadtbahn. Photo: Fabian Sommer/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020052900318

  •  Berlin S-Bahn put out to tender
    2020年05月27日
    Berlin S-Bahn put out to tender

    27 May 2020, Berlin: An S-Bahn (suburban train) enters the Tiergarten station. The Berlin Senate has approved the award procedure for the S-Bahn sub-networks North-South and Stadtbahn. Photo: Fabian Sommer/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020052900204

  •  Berlin S-Bahn put out to tender
    2020年05月27日
    Berlin S-Bahn put out to tender

    27 May 2020, Berlin: An S-Bahn (suburban train) enters the Tiergarten station. The Berlin Senate has approved the award procedure for the S-Bahn sub-networks North-South and Stadtbahn. Photo: Fabian Sommer/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020052900409

  •  Construction site B 96a
    2020年05月28日
    Construction site B 96a

    28 May 2020, Berlin: The S-Bahn S9 to Spandau stops at Altglienicke station. On the left, cars and trucks drive on a narrowed two-lane road due to the construction site on the federal road 96a near the border to the state of Brandenburg. The 96a was built between Mahlow and Adlergestell about 50 years ago as a bypass and replacement connection for the B 96 leading through West Berlin. After completion of the construction work in the second quarter of 2021, there will be a four-lane road separated by a green strip and a cycle and footpath about four metres wide, connecting Altglienicke with the cycle path network of the neighbouring municipality of Schönefeld. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020060401295

  •  Construction site B 96a
    2020年05月28日
    Construction site B 96a

    28 May 2020, Berlin: The S-Bahn S9 to Schönefeld Airport leaves shortly before Altglienicke station. On the right is the two-lane roadway of the Bundesstraße 96a near the border to the state of Brandenburg, which is narrowed due to the construction site. The 96a was built between Mahlow and Adlergestell about 50 years ago as a bypass and replacement connection for the B 96 leading through West Berlin. After completion of the construction work in the second quarter of 2021, there will be a four-lane road separated by a green strip and an approximately four-metre-wide cycle path and footpath connecting Altglienicke with the cycle path network of the neighbouring municipality of Schönefeld. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020060401487

  •  S-Bahn to the airport
    2020年05月28日
    S-Bahn to the airport

    28 May 2020, Berlin: The S-Bahn S9 to Schönefeld Airport stops at Altglienicke station. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020061101590

  •  In the morning in Berlin
    2020年06月09日
    In the morning in Berlin

    09 June 2020, Berlin: An S-Bahn is standing in the station Friedrichstra゚e, while people walk on the platform. Photo: Paul Zinken/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020061201319

  •  In the morning in Berlin
    2020年06月09日
    In the morning in Berlin

    09 June 2020, Berlin: An S-Bahn is standing in the station Friedrichstra゚e, while people walk on the platform. Photo: Paul Zinken/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020061201318

  •  View from the Bode-Museum
    2020年07月03日
    View from the Bode-Museum

    03 July 2020, Berlin: View from the roof of the Bode-Museum to the station Alexanderplatz with a found out S-Bahn. Photo: Gerald Matzka/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020070606556

  •  Traffic in Berlin
    2020年09月17日
    Traffic in Berlin

    17 September 2020, Berlin: An S-Bahn (urban railway) enters the station at Jannowitzbrücke. Photo: Paul Zinken/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020091807703

  •  Fire at Tiergarten S-Bahn station
    2020年10月09日
    Fire at Tiergarten S-Bahn station

    09 October 2020, Berlin: “S-Bahn Emergency Service“ is written on the warning vest of an employee passing a barrier tape on the platform of the S-Bahn station Tiergarten. After a fire in the Tiergarten S-Bahn station, the temporary interruption of train traffic has been lifted and the fire brigade operation has been terminated. Photo: Annette Riedl/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2020101506056

  •  Public transport - Berlin
    2020年11月08日
    Public transport - Berlin

    08 November 2020, Berlin: An S-Bahn (suburban train) enters the station Warschauer Straße. Photo: Kira Hofmann/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111301086

  •  Public transport - Berlin
    2020年11月08日
    Public transport - Berlin

    08 November 2020, Berlin: An S-Bahn (suburban train) enters the station Warschauer Strasse. Photo: Kira Hofmann/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111201601

  •  Winter weather - Berlin
    2021年02月08日
    Winter weather - Berlin

    08 February 2021, Berlin: An S-Bahn of the line S3 drives in the snow-covered track bed at the S-Bahn station Karlshorst and swirls up the snow. Photo: Jens Kalaene/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2021021011049

  •  Winter weather - Berlin
    2021年02月08日
    Winter weather - Berlin

    08 February 2021, Berlin: An S-Bahn of the line S3 runs in the snow-covered track bed at the S-Bahn station Karlshorst. Photo: Jens Kalaene/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2021021011345

  •  Winter weather - Berlin
    2021年02月08日
    Winter weather - Berlin

    08 February 2021, Berlin: An S-Bahn of the line S3 runs in the snow-covered track bed at the S-Bahn station Karlshorst. Photo: Jens Kalaene/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2021021011428

  •  Winter weather - Berlin
    2021年02月08日
    Winter weather - Berlin

    08 February 2021, Berlin: An S-Bahn of the line S3 drives in the snow-covered track bed at the S-Bahn station Karlshorst and swirls up the snow. Photo: Jens Kalaene/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2021021011046

  •  Winter weather - Berlin
    2021年02月08日
    Winter weather - Berlin

    08 February 2021, Berlin: The S-Bahn S3 to Spandau runs through the snow at a station. Currently, there are weather-related restrictions in the entire Berlin S-Bahn network. Photo: Kira Hofmann/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2021020905700

  •  Winter weather - Berlin
    2021年02月08日
    Winter weather - Berlin

    08 February 2021, Berlin: An S-Bahn of the line S3 drives in the snow-covered track bed at the S-Bahn station Karlshorst and swirls up the snow. Photo: Jens Kalaene/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2021021011050

  •  Winter weather - Berlin
    2021年02月08日
    Winter weather - Berlin

    08 February 2021, Berlin: Icicles are hanging from the windscreen wipers of an S-Bahn train. Currently, there are weather-related restrictions in the entire Berlin S-Bahn network. Photo: Kira Hofmann/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2021020905900

  •  Winter weather in Berlin
    2021年02月08日
    Winter weather in Berlin

    08 February 2021, Berlin: On the window pane of an S-Bahn train hangs a sign with the inscription “Entry only with mask!“ and drops of water are frozen. There are currently weather-related restrictions throughout Berlin‘s S-Bahn network. Photo: Kira Hofmann/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2021020905739

  •  Winter weather - Berlin
    2021年02月08日
    Winter weather - Berlin

    08 February 2021, Berlin: A man waits at the station for the S-Bahn. Currently, there are weather-related restrictions in the entire Berlin S-Bahn network. Photo: Kira Hofmann/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2021020905763

  •  Thaw in Berlin
    2021年02月17日
    Thaw in Berlin

    17 February 2021, Berlin: The S-Bahn station and the world time clock are reflected in a puddle of rain on the almost deserted Alexanderplatz. After the arctic cold, the next few days will be almost spring-like: an Atlantic low is bringing much milder weather to Germany. Photo: Kira Hofmann/dpa-Zentralbild/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2021021805790

  • 1