KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00

「ラ・ロブラ」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
並び順
  • 古い順
10
( 1 10 件を表示)
  • 1
10
( 1 10 件を表示)
絞り込み
並び順
  • 古い順
  •  Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line
    2021年09月20日
    Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line

    September 20, 2021, Asturias, Madrid, Spain: The Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez, speaks at an event after travelling on the first test train on the Pajares Bypass between La Robla and Campomanes of the León-Asturias High-Speed Line, on 20 September 2021, in Campomanes, Asturias (Spain). The Pajares Bypass, which runs 49 kilometres in length between La Robla (León) and Pola de Lena (Asturias), will serve to optimise high-speed and freight traffic between León and Asturias, reduce travel time on the Valladolid-León-Oviedo/Gijón route, and provide an improved service to citizens, companies and railway operators. More than 3,716 million euros have been invested in the construction of this infrastructure since work began in 2004...20 SEPTEMBER 2021;PAJARES VARIANT;ASTURIAS;OVIEDO;RAQUEL SÃÂNCHEZ;HIGH SPEED RAIL..Jorge Peteiro / Europa Press..09/20/2021 (Credit Image: © Jorge Peteiro/Contacto via ZUMA Press)、クレジット:©Jorge Peteiro/Contacto via ZUMA Press/共同通信イメージズ ※...

    商品コード: 2021092102969

  •  Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line
    2021年09月20日
    Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line

    September 20, 2021, Asturias, Madrid, Spain: The Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez, meets with the President of the Principality of Asturias, Adrián Barbón, at the Principality‘s Government headquarters, after travelling on the first test train along the Pajares Bypass between La Robla and Campomanes of the León-Asturias High-Speed Line, on 20 September 2021, in Oviedo, Asturias (Spain). The Pajares Bypass, which runs 49 kilometres in length between La Robla (León) and Pola de Lena (Asturias), will serve to optimise high-speed and freight traffic between León and Asturias, reduce travel time on the Valladolid-León-Oviedo/Gijón route, and provide an improved service to citizens, companies and railway operators. More than 3,716 million euros have been invested in the construction of this infrastructure since work began in 2004...20 SEPTEMBER 2021;PAJARES VARIANT;ASTURIAS;OVIEDO;RAQUEL SÃÂNCHEZ;HIGH SPEED RAIL..Jorge Peteiro / Europa Press..09/20/2021 (Credit Ima...

    商品コード: 2021092103523

  •  Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line
    2021年09月20日
    Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line

    September 20, 2021, Asturias, Madrid, Spain: The Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez, speaks at an event after travelling on the first test train on the Pajares Bypass between La Robla and Campomanes of the León-Asturias High-Speed Line, on 20 September 2021, in Campomanes, Asturias (Spain). The Pajares Bypass, which runs 49 kilometres in length between La Robla (León) and Pola de Lena (Asturias), will serve to optimise high-speed and freight traffic between León and Asturias, reduce travel time on the Valladolid-León-Oviedo/Gijón route, and provide an improved service to citizens, companies and railway operators. More than 3,716 million euros have been invested in the construction of this infrastructure since work began in 2004...20 SEPTEMBER 2021;PAJARES VARIANT;ASTURIAS;OVIEDO;RAQUEL SÃÂNCHEZ;HIGH SPEED RAIL..Jorge Peteiro / Europa Press..09/20/2021 (Credit Image: © Jorge Peteiro/Contacto via ZUMA Press)、クレジット:©Jorge Peteiro/Contacto via ZUMA Press/共同通信イメージズ ※F...

    商品コード: 2021092102944

  •  Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line
    2021年09月20日
    Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line

    September 20, 2021, Asturias, Madrid, Spain: The Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez, meets with the President of the Principality of Asturias, Adrián Barbón, at the Principality‘s Government headquarters, after travelling on the first test train along the Pajares Bypass between La Robla and Campomanes of the León-Asturias High-Speed Line, on 20 September 2021, in Oviedo, Asturias (Spain). The Pajares Bypass, which runs 49 kilometres in length between La Robla (León) and Pola de Lena (Asturias), will serve to optimise high-speed and freight traffic between León and Asturias, reduce travel time on the Valladolid-León-Oviedo/Gijón route, and provide an improved service to citizens, companies and railway operators. More than 3,716 million euros have been invested in the construction of this infrastructure since work began in 2004...20 SEPTEMBER 2021;PAJARES VARIANT;ASTURIAS;OVIEDO;RAQUEL SÃÂNCHEZ;HIGH SPEED RAIL..Jorge Peteiro / Europa Press..09/20/2021 (Credit Ima...

    商品コード: 2021092103627

  •  Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line
    2021年09月20日
    Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line

    September 20, 2021, Asturias, Madrid, Spain: The Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez, speaks at an event after travelling on the first test train on the Pajares Bypass between La Robla and Campomanes of the León-Asturias High-Speed Line, on 20 September 2021, in Campomanes, Asturias (Spain). The Pajares Bypass, which runs 49 kilometres in length between La Robla (León) and Pola de Lena (Asturias), will serve to optimise high-speed and freight traffic between León and Asturias, reduce travel time on the Valladolid-León-Oviedo/Gijón route, and provide an improved service to citizens, companies and railway operators. More than 3,716 million euros have been invested in the construction of this infrastructure since work began in 2004...20 SEPTEMBER 2021;PAJARES VARIANT;ASTURIAS;OVIEDO;RAQUEL SÃÂNCHEZ;HIGH SPEED RAIL..Jorge Peteiro / Europa Press..09/20/2021 (Credit Image: © Jorge Peteiro/Contacto via ZUMA Press)、クレジット:©Jorge Peteiro/Contacto via ZUMA Press/共同通信イメージズ ※...

    商品コード: 2021092102091

  •  Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line
    2021年09月20日
    Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line

    September 20, 2021, Asturias, Madrid, Spain: The President of the Asturian Government, Adrián Barbón, makes a statement to the media after meeting at the Principality‘s Government headquarters after taking part in the first test train journey along the Pajares railway bypass, from La Robla to Campomanes on the León-Asturias High-Speed Line (LAV), on 20 September 2021, in Oviedo, Asturias (Spain). The Pajares Bypass, which runs 49 kilometres in length between La Robla (León) and Pola de Lena (Asturias), will serve to optimise high-speed and freight traffic between León and Asturias, reduce travel time on the Valladolid-León-Oviedo/Gijón route, and provide an improved service to citizens, companies and railway operators. More than 3,716 million euros have been invested in the construction of this infrastructure since work began in 2004...20 SEPTEMBER 2021;PAJARES VARIANT;ASTURIAS;OVIEDO;RAQUEL SÃÂNCHEZ;HIGH SPEED RAIL..Jorge Peteiro / Europa Press..09/20/2021 (Credit Image: © Jorge Peteiro/Con...

    商品コード: 2021092103528

  •  Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line
    2021年09月20日
    Journey of the first test train along the Pajares Bypass, on the León-Asturias High-Speed Line

    September 20, 2021, Asturias, Madrid, Spain: The Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez, meets with the President of the Principality of Asturias, Adrián Barbón, at the Principality‘s Government headquarters, after travelling on the first test train along the Pajares Bypass between La Robla and Campomanes of the León-Asturias High-Speed Line, on 20 September 2021, in Oviedo, Asturias (Spain). The Pajares Bypass, which runs 49 kilometres in length between La Robla (León) and Pola de Lena (Asturias), will serve to optimise high-speed and freight traffic between León and Asturias, reduce travel time on the Valladolid-León-Oviedo/Gijón route, and provide an improved service to citizens, companies and railway operators. More than 3,716 million euros have been invested in the construction of this infrastructure since work began in 2004...20 SEPTEMBER 2021;PAJARES VARIANT;ASTURIAS;OVIEDO;RAQUEL SÃÂNCHEZ;HIGH SPEED RAIL..Jorge Peteiro / Europa Press..09/20/2021 (Credit Ima...

    商品コード: 2021092103465

  •  Raquel Sánchez visits by train the Pajares bypass between León and Asturias
    2022年11月09日
    Raquel Sánchez visits by train the Pajares bypass between León and Asturias

    November 9, 2022, La Robla, León (Castilla y LeÃ, Spain: The territorial delegate of the Regional Government of Castilla y León in León, Esther Muñoz, greets the Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez, and the President of the Government of Asturias, Adrián Barbón, during their visit to the Pajares Bypass, on November 9, 2022, in La Robla, León, Castilla y León (Spain). During the train ride, Raquel Sánchez travels the 39 kilometers of the Pajares bypass between La Robla (León) and Campomanes (Asturias), a section that includes a double tunnel of almost 25 kilometers that crosses the Cantabrian Mountains and whose commissioning will avoid the use of the century-old Pajares ramp. The project is the future León-Asturias High Speed Line and is considered one of the most complex civil engineering works carried out in the country to date. Since 2004, the bypass has involved an investment of more than 3,700 million euros...09 NOVEMBER 2022;CASTILLA Y LEÃâN;ASTURI...

    商品コード: 2022111014360

  •  Raquel Sánchez visits by train the Pajares bypass between León and Asturias
    2022年11月09日
    Raquel Sánchez visits by train the Pajares bypass between León and Asturias

    November 9, 2022, Campomanes (Asturias, Spain: The Government Delegate in the Principality of Asturias, Delia Losa Carballido (left) and the Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez (right), during their visit to the Pajares Bypass on board a train, on November 9, 2022, in Campomanes, Asturias (Spain). During the train ride, Raquel Sánchez travels the 39 kilometers of the Pajares bypass between La Robla (León) and Campomanes (Asturias), a section that includes a double tunnel of almost 25 kilometers that crosses the Cantabrian Mountains and whose commissioning will avoid the use of the century-old Pajares ramp. The project is the future León-Asturias High Speed Line and is considered one of the most complex civil engineering works carried out in the country to date. Since 2004, the bypass has involved an investment of more than 3,700 million euros...09 NOVEMBER 2022;CASTILLA Y LEÃâN;ASTURIAS;PAJARES;PAJARES VARIANT;LEON;TRAIN;TRANSPORTATION;TUNNEL..Secundino Pérez / Europa...

    商品コード: 2022111014430

  •  Raquel Sánchez visits by train the Pajares bypass between León and Asturias
    2022年11月09日
    Raquel Sánchez visits by train the Pajares bypass between León and Asturias

    November 9, 2022, La Robla, León (Castilla y LeÃ, Spain: (L-R) The mayor of León, José Antonio Díez; the PSOE deputy for León, Javier Alonso Cendón, who greets the Minister of Transport, Mobility and Urban Agenda, Raquel Sánchez, and the President of the Government of Asturias, Adrián Barbón, during their visit to the Pajares Bypass, on November 9, 2022, in La Robla, León, Castilla y León (Spain). During the train ride, Raquel Sánchez travels the 39 kilometers of the Pajares bypass between La Robla (León) and Campomanes (Asturias), a section that includes a double tunnel of almost 25 kilometers that crosses the Cantabrian Mountains and whose commissioning will avoid the use of the century-old Pajares ramp. The project is the future León-Asturias High Speed Line and is considered one of the most complex civil engineering works carried out in the country to date. Since 2004, the bypass has involved an investment of more than 3,700 million euros...09 NOVEMBER 2022;CASTILLA Y LEÃâN;...

    商品コード: 2022111014346

  • 1