KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00

「旧鉄道橋」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
並び順
  • 古い順
6
( 1 6 件を表示)
  • 1
6
( 1 6 件を表示)
絞り込み
並び順
  • 古い順
  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: Construction machines crush and load the abutments of the former railway bridge on the construction site of the A10 motorway near the Birkenwerder junction. The night-time work was in preparation for the lifting of a steel bridge weighing about 205 tons and a steel bridge weighing about 180 tons for the railway or S-Bahn connection between Oranienburg and Hohen-Neuendorf. The replacement construction by the joint venture (ARGE) Havellandautobahn GmbH is part of the expansion of the A10 motorway and requires a complete closure of the motorway from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111305028

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: Construction machines crush and load the abutments of the former railway bridge on the construction site of the A10 motorway near the Birkenwerder junction. The night-time work was in preparation for the lifting of a steel bridge weighing about 205 tons and a steel bridge weighing about 180 tons for the railway or S-Bahn connection between Oranienburg and Hohen-Neuendorf. The replacement construction by the joint venture (ARGE) Havellandautobahn GmbH is part of the expansion of the A10 motorway and requires a complete closure of the motorway from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111303018

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: Construction machines crush and load the abutments of the former railway bridge on the construction site of the A10 motorway near the Birkenwerder junction, while a regional train passes by in the background. The night-time work was in preparation for the lifting of a steel bridge weighing about 205 tons and a steel bridge weighing about 180 tons for the railway or S-Bahn connection between Oranienburg and Hohen-Neuendorf. The replacement construction by the joint venture (ARGE) Havellandautobahn GmbH is part of the expansion of the A10 motorway and requires a complete closure of the motorway from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111304144

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: Construction machines crush and load the abutments of the former railway bridge on the construction site of the A10 motorway near the Birkenwerder junction. The night-time work was in preparation for the lifting of a steel bridge weighing about 205 tons and a steel bridge weighing about 180 tons for the railway or S-Bahn connection between Oranienburg and Hohen-Neuendorf. The replacement construction by the joint venture (ARGE) Havellandautobahn GmbH is part of the expansion of the A10 motorway and requires a complete closure of the motorway from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111304808

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: Construction machines crush and load the abutments of the former railway bridge on the construction site of the A10 motorway near the Birkenwerder junction. The night-time work was in preparation for the lifting of a steel bridge weighing about 205 tons and a steel bridge weighing about 180 tons for the railway or S-Bahn connection between Oranienburg and Hohen-Neuendorf. The replacement construction by the joint venture (ARGE) Havellandautobahn GmbH is part of the expansion of the A10 motorway and requires a complete closure of the motorway from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111305016

  •  Construction site motorway A10
    2020年11月10日
    Construction site motorway A10

    10 November 2020, Brandenburg, Birkenwerder: Construction machines crush and load the abutments of the former railway bridge on the construction site of the A10 motorway near the Birkenwerder junction. The night-time work was in preparation for the lifting of a steel bridge weighing about 205 tons and a steel bridge weighing about 180 tons for the railway or suburban railway connection between Oranienburg and Hohen-Neuendorf. The replacement construction by the joint venture (ARGE) Havellandautobahn GmbH is part of the expansion of the A10 motorway and requires a complete closure of the motorway from the Pankow junction until 16.11.2020. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020111304794

  • 1