KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00

「くにぽん」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
  • 同義語オン
並び順
  • 新しい順
5
( 1 5 件を表示)
  • 1
5
( 1 5 件を表示)
絞り込み
並び順
  • 新しい順
  •  East Palestine Government Cleanup
    2023年02月27日
    East Palestine Government Cleanup

    A pump system is seen placed in the Leslie Run creek near East Palestine, Ohio on February 27, 2023, following a train derailment earlier in the month which released toxic waste into the region. (Photo by Bryan Olin Dozier/NurPhoto)=クレジット:Bryan Olin Dozier/NurPhoto/共同通信イメージズ

    商品コード: 2023030112024

  •  Clean, Clear and Dry Fuel
    2020年01月07日
    Clean, Clear and Dry Fuel

    October 24, 2023 - New Hampshire, USA - Senior Airman Tabitha Burger, a petroleum, oils and lubricants specialist with the 64th Air Refueling Squadron, tests jet fuel for particulates and water Oct. 24, 2023 at Pease Air National Guard Base, New Hampshire. POL Airmen ensure the gas is clean, clear and dry before it enters the fuel lines, is pumped to the trucks, and eventually loaded onto the KC-46 for receiving aircraft. (Credit Image: © U.S. National Guard/ZUMA Press Wire)、クレジット:©U.S. National Guard/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2023102804017

  •  Sudsudan - Fresh water supply in Juba
    2019年11月16日
    Sudsudan - Fresh water supply in Juba

    Tank trucks with the corresponding inscription take over the fresh water supply of households in Juba / South Sudan, taken on November 16, 2019. Due to the lack of technical infrastructure in the South Sudanese capital, such tankers supply fresh water. The water from these vehicles is pumped into tanks on the roofs of the houses, wastewater tankers regularly empty the reservoirs that are then filled with process water and dispose of the used water. Photo: Matthias Toedt / dpa-Zentralbild / ZB / Picture Alliance | usage worldwide、クレジット:dpa-Zentralbild/DPA/共同通信イメージズ

    商品コード: 2020060200573

  •  Hellisheidei Geothermal Power Plant
    2019年06月13日
    Hellisheidei Geothermal Power Plant

    13 June 2019, Iceland, Reykjavik: Numerous pipes on the site of the Hellisheidi geothermal power plant south of Reykjavik. Hot water and steam are extracted from 50 boreholes, which can be up to 2200 metres deep. The power plant generates electricity and hot water, which is pumped to Reykjavík. Photo: Bernd von Jutrczenka/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019071709538

  •  Hellisheidei Geothermal Power Plant
    2019年06月13日
    Hellisheidei Geothermal Power Plant

    13 June 2019, Iceland, Reykjavik: Numerous pipes on the site of the Hellisheidi geothermal power plant south of Reykjavik. Hot water and steam are extracted from 50 boreholes, which can be up to 2200 metres deep. The power plant generates electricity and hot water, which is pumped to Reykjavík. Photo: Bernd von Jutrczenka/dpa、クレジット:DPA/共同通信イメージズ

    商品コード: 2019071709560

  • 1