KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00

「解体工事 その他」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 日付
  • 種類
  • 向き
  • カテゴリ
並び順
  • 新しい順
3
( 1 3 件を表示)
  • 1
3
( 1 3 件を表示)
絞り込み
並び順
  • 新しい順
  •  Construction site Nuthestra゚e-Bridge
    2020年03月12日
    Construction site Nuthestra゚e-Bridge

    12 March 2020, Brandenburg, Potsdam: A bridge section of the section of the Nuthestra゚e bridge leading out of the city was pulled over the Friedrich-Engels-Stra゚e and the railway tracks below and dismantled. The elevated road bridge has been undergoing rehabilitation for several weeks now while traffic is still running, after an inspection by the State Roads Authority revealed brittle concrete, cracks in the asphalt and other defects. The first construction phase is scheduled to be completed in the summer of 2021, followed by demolition work and the construction of the second section of the bridge for the direction towards the city centre. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020031602812

  •  Construction site Nuthestra゚e-Bridge
    2020年03月12日
    Construction site Nuthestra゚e-Bridge

    12 March 2020, Brandenburg, Potsdam: A bridge section of the section of the Nuthestra゚e bridge leading out of the city was pulled over the Friedrich-Engels-Stra゚e and the railway tracks below and dismantled. The elevated road bridge has been undergoing rehabilitation for several weeks now while traffic is still running, after an inspection by the State Roads Authority revealed brittle concrete, cracks in the asphalt and other defects. The first construction phase is scheduled to be completed in the summer of 2021, followed by demolition work and the construction of the second section of the bridge for the direction towards the city centre. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020031603067

  •  Construction site Nuthestra゚e-Bridge
    2020年03月12日
    Construction site Nuthestra゚e-Bridge

    12 March 2020, Brandenburg, Potsdam: A bridge section of the section of the Nuthestra゚e bridge leading out of the city was pulled over the Friedrich-Engels-Stra゚e and the railway tracks below and dismantled. The elevated road bridge has been undergoing rehabilitation for several weeks now while traffic is still running, after an inspection by the State Roads Authority revealed brittle concrete, cracks in the asphalt and other defects. The first construction phase is scheduled to be completed in the summer of 2021, followed by demolition work and the construction of the second section of the bridge for the direction towards the city centre. Photo: Soeren Stache/dpa-Zentralbild/ZB、クレジット:ZB/DPA/共同通信イメージズ

    商品コード: 2020031603140

  • 1