KYODO NEWS IMAGELINK

報道写真の購入なら共同通信イメージリンク

お問い合わせ
03-6252-6224
平日9:30-18:00
  • 令和
  • 記者
  • 作業員
  • 完成
  • 設置
  • 事業
  • デッキ
  • 三位一体
  • 全長
  • 役割

「組立工場」の写真・グラフィックス・映像

絞り込み
  • 提供元
  • 1年以内
  • 種類
  • 向き
  • カテゴリ
並び順
  • 新しい順
334
( 1 100 件を表示)
  • 1
  • 2
  • 3
  • 4
334
( 1 100 件を表示)
絞り込み
並び順
  • 新しい順
  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: Seat‘s CEO, Wayne Griffiths (left), and the Minister of Enterprise and Labor, Roger Torrent (right), on their arrival to visit the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirect contracts. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040511850

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: The President of the CEOE, Antonio Garamendi (2l), the First Secretary of the PSC, Salvador Illa (3l), the Minister of Enterprise and Labor, Roger Torrent (4l), the CEO of the Volkswagen brand, Thomas Schäfer (6l), the Minister of Industry and Tourism, Jordi Hereu (7l), King Felipe VI (c), the CEO of Seat, Wayne Griffiths (7r), the President of the Generalitat de Catalunya, Pere Aragonès (6r), the Government Delegate in Catalonia, Carlos Prieto (5r), and Seat‘s Vice President of Production and Logistics, Markus Haupt (4r), during a visit to the construction site of Seat‘s battery assembly plant, April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly...、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601951

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (c), Seat CEO Wayne Griffiths (2r) and the Minister of Industry and Tourism Jordi Hereu (d), on their arrival to visit the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirect contracts. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600678

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: Seat‘s Vice-President for Production and Logistics, Markus Haupt (l), the President of the Generalitat de Catalunya, Pere Aragonès (2l), Seat‘s CEO, Wayne Griffiths (3l), King Felipe VI (4l), the Minister of Industry and Tourism, Jordi Hereu (c), the CEO of the Volkswagen brand, Thomas Schäfer (4r), the First Secretary of the PSC, Salvador Illa (2r), and the Minister of Enterprise and Labor, Roger Torrent (r), during a visit to the construction site of the plant, Thomas Schäfer (4r), PSC First Secretary Salvador Illa (2r), and Minister of Enterprise and Labor Roger Torrent (r) during a visit to the construction site of Seat‘s battery assembly plant on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain)...、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601275

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    King Felipe VI (c) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512662

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    King Felipe VI (c) and Seat CEO Wayne Griffiths (d) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512667

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    (L-R) The Minister of Industry and Tourism, Jordi Hereu, the President of the Generalitat de Catalunya, Pere Aragonès, Seat‘s Vice-President for Production and Logistics, Markus Haupt, and King Felipe VI during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512670

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (c) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601051

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (left) and Seat CEO Wayne Griffiths (right) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601285

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) King Felipe VI, the President of the Generalitat de Catalunya, Pere Aragonès, and the CEO of Seat, Wayne Griffiths, and the CEO of the Volkswagen brand, Thomas Schäfer, during the visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601306

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) Seat Vice President for Production and Logistics Markus Haupt, the President of the Generalitat de Catalunya, Pere Aragonès, Seat CEO Wayne Griffiths, and King Felipe VI during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601309

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: The President of the Generalitat de Catalunya, Pere Aragonès (c), and King Felipe VI (d) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601227

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) The Minister of Industry and Tourism, Jordi Hereu, Volkswagen CEO Thomas Schäfer, Seat‘s Vice President for Production and Logistics, Markus Haupt, King Felipe VI, the Minister of Enterprise and Labor, Roger Torrent, Seat CEO Wayne Griffiths, and the President of the Generalitat de Catalunya, Pere Aragonès, during the visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly...、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601328

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) King Felipe VI, Seat CEO Wayne Griffiths, Industry and Tourism Minister Jordi Hereu and CEOE President Antonio Garamendi on their arrival to visit the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirect contracts. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040512692

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    King Felipe VI during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512672

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (c) poses in a family photo with those attending the visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601983

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) The Minister of Industry and Tourism, Jordi Hereu, Seat‘s Vice-President for Production and Logistics, Markus Haupt, King Felipe VI, the President of the Generalitat de Catalunya, Pere Aragonès, and Seat‘s CEO, Wayne Griffiths, during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601243

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) Volkswagen CEO Thomas Schäfer, the President of the Generalitat de Catalunya, Pere Aragonès, King Felipe VI, Seat CEO Wayne Griffiths, and the Minister of Industry and Tourism, Jordi Hereu, during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601312

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    (L-R) King Felipe VI, the President of the Generalitat de Catalunya, Pere Aragonès, and Seat CEO Wayne Griffiths, during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512664

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: The President of the Generalitat de Catalunya, Pere Aragonès (l), greets Seat CEO Wayne Griffiths (2l) and Volkswagen brand CEO Thomas Schäfer (c) on their arrival to visit the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirect contracts. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600617

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) The Minister of Industry and Tourism, Jordi Hereu, the President of the Generalitat de Catalunya, Pere Aragonès, Seat‘s Vice-President for Production and Logistics, Markus Haupt, and King Felipe VI during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601301

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (c) and Seat CEO Wayne Griffiths (d) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601258

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (c) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601268

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) Volkswagen CEO Thomas Schäfer, the President of the Generalitat de Catalunya, Pere Aragonès, King Felipe VI, Seat CEO Wayne Griffiths, and the Minister of Industry and Tourism, Jordi Hereu, during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601277

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) The Minister of Industry and Tourism, Jordi Hereu, the President of the Generalitat de Catalunya, Pere Aragonès, Seat‘s Vice-President for Production and Logistics, Markus Haupt, and King Felipe VI during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601267

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    (L-R) Volkswagen CEO Thomas Schäfer, the President of the Generalitat de Catalunya, Pere Aragonès, King Felipe VI, Seat CEO Wayne Griffiths, and the Minister of Industry and Tourism, Jordi Hereu, during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512668

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: The President of the Generalitat de Catalunya, Pere Aragonès (l), greets Seat CEO Wayne Griffiths (c) and Volkswagen brand CEO Thomas Schäfer (5r) on their arrival to visit the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirect contracts. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600615

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: The CEO of the Volkswagen brand, Thomas Schäfer, speaks during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600514

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600522

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    (L-R) The Minister of Industry and Tourism, Jordi Hereu, Seat‘s Vice President for Production and Logistics, Markus Haupt, King Felipe VI, the President of the Generalitat de Catalunya, Pere Aragonès, Seat‘s CEO, Wayne Griffiths, and the CEO of the Volkswagen brand, Thomas Schäfer, during the visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512663

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: Seat CEO Wayne Griffiths speaks during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601294

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) Seat‘s Vice President for Production and Logistics, Markus Haupt, the President of the Generalitat de Catalunya, Pere Aragonès, Seat CEO Wayne Griffiths, King Felipe VI and the Minister of Industry and Tourism, Jordi Hereu, during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601265

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (l), Seat CEO Wayne Griffiths (2l), Industry and Tourism Minister Jordi Hereu (3l), and CEOE President Antonio Garamendi (3r), on their arrival to visit the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirect contracts. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040512694

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: The President of the Generalitat de Catalunya, Pere Aragonès (left), and King Felipe VI (right) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600506

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: The President of the Generalitat de Catalunya, Pere Aragonès (left), and King Felipe VI (right) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601072

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) King Felipe VI, the President of the Generalitat de Catalunya, Pere Aragonès, and Seat CEO Wayne Griffiths, during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601283

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) The Minister of Industry and Tourism, Jordi Hereu, Seat‘s Vice President for Production and Logistics, Markus Haupt, King Felipe VI, the President of the Generalitat de Catalunya, Pere Aragonès, Seat‘s CEO, Wayne Griffiths, and the CEO of the Volkswagen brand, Thomas Schäfer, during the visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly...、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601288

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (c) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601290

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600583

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) King Felipe VI, Seat CEO Wayne Griffiths and the Minister of Industry and Tourism Jordi Hereu on their arrival to visit the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirect contracts. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600662

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (c) poses in a family photo with those attending the visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601984

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: The President of the Generalitat de Catalunya, Pere Aragonès (left), and King Felipe VI (right) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601311

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) Volkswagen CEO Thomas Schäfer, the President of the Generalitat de Catalunya, Pere Aragonès, King Felipe VI, Seat CEO Wayne Griffiths, and the Minister of Industry and Tourism, Jordi Hereu, during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040601586

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: (L-R) The Minister of Industry and Tourism, Jordi Hereu, Seat‘s Vice President for Production and Logistics, Markus Haupt, King Felipe VI, the President of the Generalitat de Catalunya, Pere Aragonès, Seat‘s CEO, Wayne Griffiths, and the CEO of the Volkswagen brand, Thomas Schäfer, during the visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly...、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040600501

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    (L-R) Volkswagen CEO Thomas Schäfer, the President of the Generalitat de Catalunya, Pere Aragonès, King Felipe VI, Seat CEO Wayne Griffiths, and the Minister of Industry and Tourism, Jordi Hereu, during a visit to the construction site of Seat‘s battery assembly plant in Martorell, Barcelona, Catalonia (Spain), on April 5, 2024. The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512665

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    Seat‘s Vice-President for Production and Logistics, Markus Haupt (l), the President of the Generalitat de Catalunya, Pere Aragonès (2l), Seat‘s CEO, Wayne Griffiths (3l), King Felipe VI (4l), the Minister of Industry and Tourism, Jordi Hereu (c), the CEO of the Volkswagen brand, Thomas Schäfer (4r), the First Secretary of the PSC, Salvador Illa (2r), and the Minister of Enterprise and Labor, Roger Torrent (r), during a visit to the construction site of the plant, Thomas Schäfer (4r), PSC First Secretary Salvador Illa (2r), and Minister of Enterprise and Labor Roger Torrent (r) during a visit to the construction site of Seat‘s battery assembly plant on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly...、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512666

  •  King Felipe VI Visits Seat Battery Assembly Plant - Barcelona
    2024年04月05日
    King Felipe VI Visits Seat Battery Assembly Plant - Barcelona

    King Felipe VI (c) during a visit to the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirectly. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready. Photo by David Zorrakino/Europa Press/ABACAPRESS.COM、クレジット:Europa Press/ABACA/共同通信イメージズ ※Spain Out

    商品コード: 2024040512669

  •  King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).
    2024年04月05日
    King Felipe VI and Pere Aragonés visit the works of the Seat battery assembly plant in Martorell (Barcelona).

    April 5, 2024, Martorell, Barcelona (Catalonia, Spain: King Felipe VI (c), Seat CEO Wayne Griffiths (2r) and the Minister of Industry and Tourism Jordi Hereu (d), on their arrival to visit the construction site of Seat‘s battery assembly plant, on April 5, 2024, in Martorell, Barcelona, Catalonia (Spain). The Spanish company, a subsidiary of Volkswagen, will invest 300 million euros in the new facilities and will employ some 400 people directly and around a hundred indirect contracts. The aim is to power the electric vehicles, initially of the Volkswagen and Cupra brands, that will leave the factory from 2025, when its conversion is ready...05 APRIL 2024..David Zorrakino / Europa Press..04/05/2024 (Credit Image: © David Zorrakino/Contacto via ZUMA Press)、クレジット:©David Zorrakino/Contacto via ZUMA Press/共同通信イメージズ ※Spain Rights OUT

    商品コード: 2024040512691

  •  「新華社」エアバス天津工場、第2最終組み立てラインの建設順調
    00:49.43
    2024年04月03日
    「新華社」エアバス天津工場、第2最終組み立てラインの建設順調

    中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(記者/李帥) =配信日: 2024(令和6)年4月3日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040307903

  •  (4)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (4)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場で働く作業員。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209301

  •  (7)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (7)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場で働く作業員。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209303

  •  (8)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (8)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場で働く作業員。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209298

  •  (5)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (5)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場で働く作業員。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209299

  •  (3)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (3)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場で働く作業員。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209297

  •  (6)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (6)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場で働く作業員。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209307

  •  (9)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (9)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場で働く作業員。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209308

  •  (1)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (1)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場で働く作業員。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209300

  •  (2)エアバス天津工場、第2最終組み立てラインの建設順調
    2024年04月02日
    (2)エアバス天津工場、第2最終組み立てラインの建設順調

    3月31日、エアバス天津第2最終組み立てラインの建設現場。中国インフラ建設大手の中国鉄建大橋工程局集団が建設を請け負う欧州旅客機大手エアバスの天津で2本目となる「A320」シリーズ最終組み立てラインで3月31日、同事業で最大の単体建築物となる「209最終組立工場」が基礎工事を完了し、主要施工段階に入った。2本目の組み立てラインでは主にA320とA321のシリーズを生産する。最終組立工場の建屋など13の単体建築物が建設され、2026年末の引き渡し・生産開始が予定されている。(天津=新華社記者/趙子碩)= 配信日: 2024(令和6)年4月2日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024040209302

  •  (2)ボアオ・アジアフォーラム年次総会、アジアの協力を議論
    2024年03月28日
    (2)ボアオ・アジアフォーラム年次総会、アジアの協力を議論

    19日、奇瑞(CHERY)新能源汽車石家荘分公司の組立工場の生産ラインで働く作業員。中国海南省瓊海(けいかい)市博鰲(ボアオ)鎮で26日、ボアオ・アジアフォーラム2024年年次総会が開幕した。今年は「アジアと世界:共通の課題、共同の責任」がテーマで、アジア諸国の協力が議論の焦点となる。会期は29日まで。各界の出席者らからは、アジアは世界の発展と協力を推進する重要な力であり、複雑で変わりやすい外部環境に直面する中、各国は地域協力を強化し、世界経済の成長促進に貢献すべきだとの声が上がっている。(石家荘=新華社記者/牟宇)= 配信日: 2024(令和6)年3月28日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024032812389

  •  「新華社」協力を深めるエアバスと中国の航空産業チェーン
    00:56.29
    2024年03月25日
    「新華社」協力を深めるエアバスと中国の航空産業チェーン

    中国天津市にある欧州航空機大手エアバスのA320型機アジア最終組立工場ではこのところ、新工場建屋の建築設計図を完成させ、施工区画に仮囲いを設置し、電力系統の工事を行うなど、2本目の生産ライン建設の準備作業が急ピッチで進められている。エアバス社と中国の協力は1985年に始まった。40年近くが経過し、同社と中国の産業協力総額は2005年の3450万ドル(1ドル=約151円)から、20年には約10億ドルまで上昇した。加速し続けるエアバスと中国の協力進行過程も、双方の工業生産の深い融合を物語っている。05年、エアバス(北京)工程技術センターが設立された。17年、同社はアジア初のイノベーションセンターとして、広東省深圳市に中国イノベーションセンターを開設。23年4月には江蘇省蘇州市の蘇州工業園区(蘇州工業パーク)に中国研究開発センターを立ち上げた。エアバスが中国で構築した現地サプライチェーン(供給網)のエコシステムが徐々に形を整えるにつれ、ブラケット、コーナーパーツ、シートなどの小型部品から機体の胴体部分、翼、キャビンドアなど大型部品まで、エアバス機の「中国要素」はますます増えている。現在、中国ではサプライヤー約200社がエアバス社に製品を供給しており、エアバス製民間機全てのモデルに中国企業が生産した部品が使われている。民間航空機協力に加え、エアバスはヘリコプター分野でも協力を拡大している。同社傘下のエアバス・ヘリコプターズは現在、中国の民間ヘリコプター市場で34%のシェアを占め、同社のヘリ330機以上が中国の空を飛び、100近くの中国顧客にサービスを提供している。40年近くにおよぶ深い協力により、中国の関連産業チェーンの改善が進んだだけでなく、エアバスも中国から世界へ供給する能力を持つようになり、世界の航空産業の発展を後押ししている。(記者/李帥、王暉) =配信日: 2024(令和6)年3月25日、クレジット:新華社/共同通信イメージズ

    商品コード: 2024032505653

  •  Russia Defence Tank Production
    2024年02月16日
    Russia Defence Tank Production

    15.02.2024 A T-72 main battle tank is seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021607764

  •  Russia Defence Tank Production
    2024年02月16日
    Russia Defence Tank Production

    15.02.2024 A “No Entry“ sign is seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021607763

  •  Russia Defence Tank Production
    2024年02月16日
    Russia Defence Tank Production

    15.02.2024 T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021607765

  •  Russia Defence Tank Production
    2024年02月16日
    Russia Defence Tank Production

    15.02.2024 Workers assemble T-72 main battle tanks at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021607767

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Turrets of Terminator tank support fighting vehicles (BMPT) are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021607715

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72 and T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604254

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72 tank turrets are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021607712

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72 tank turrets are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021607713

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Workers are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604269

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Workers are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604271

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Tank turrets are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604252

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Tank turrets are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604248

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Tank turrets are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604251

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72 and T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604253

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72, T-90 main battle tanks and a Terminator tank support fighting vehicle (BMPT) are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604249

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72, T-90 main battle tanks and a Terminator tank support fighting vehicle (BMPT) are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604261

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Workers assemble a T-72 main battle tank at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604265

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Workers assemble a T-72 main battle tank at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604263

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Workers assemble a T-72 main battle tank at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604267

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604272

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604264

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 Workers assemble a T-90 main battle tank at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604256

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 A BMPT ‘‘Terminator‘‘ armored tank support fighting vehicle (AFV) is seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604175

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72 and T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604168

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72 and T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604188

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72 and T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604158

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-72 and T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604127

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 A Terminator tank support fighting vehicle (BMPT) is seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604153

  •  Russia Defence Tank Production
    2024年02月15日
    Russia Defence Tank Production

    15.02.2024 T-90 main battle tanks are seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604125

  •  Russia Putin Ural Federal District
    2024年02月15日
    Russia Putin Ural Federal District

    15.02.2024 A T-72 B3 main battle tank is seen at a mechanical assembly shop of the Uralvagonzavod machine building plant in Nizhny Tagil, Sverdlovsk region, Russia. Ramil Sitdikov / Sputnik、クレジット:Sputnik/共同通信イメージズ

    商品コード: 2024021604114

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: A Southwest Airlines 737 MAX 8 in production at the Boeing Renton Factory in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508867

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: Winglet detail of an Aeroméxico 737 MAX in production at the Boeing Renton Factory in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508898

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: A Southwest Airlines 737 MAX 8 in production at the Boeing Renton Factory in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508863

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: A United Airlines 737 MAX 8 in production takes off on a test flight at Renton Municipal Airport in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508880

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: A United Airlines 737 MAX 8 in production takes off on a test flight at Renton Municipal Airport in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011507391

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: A United Airlines 737 MAX 8 in production takes off on a test flight at Renton Municipal Airport in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508963

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: A United Airlines 737 MAX 8 in production takes off on a test flight at Renton Municipal Airport in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508927

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: The sun rises over a variety of 737 MAX airplanes parked along Lake Washington at the Boeing Renton Factory in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508871

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: The sun rises over a Flydubai 737 MAX airplane in production at the Boeing Renton Factory in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508859

  •  FAA Increasing Oversight of Boeing Production and Manufacturing
    2024年01月14日
    FAA Increasing Oversight of Boeing Production and Manufacturing

    January 14, 2024, Renton, Washington, U.S: Employees greet each other as they come and go from the Boeing Renton Factory in Renton, Washington on Sunday, January 14, 2024. The U.S. Federal Aviation Administration has announced increased oversight of Boeing production and manufacturing following an incident on a Boeing Model 737-9 MAX in which the aircraft lost a passenger door plug while in flight. (Credit Image: © Paul Christian Gordon/ZUMA Press Wire)、クレジット:©Paul Christian Gordon/ZUMA Press Wire/共同通信イメージズ

    商品コード: 2024011508966

  • 1
  • 2
  • 3
  • 4